Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
03/14/2003 ENGINEERING - FINAL Approved
03/11/2003 ENGINEERING - FINAL Approved
03/06/2003 ENGINEERING - FINAL Partial Approval TEMPORARY C OF O APPROVED.
FINAL C OF O NOT TO BE ISSUED UNTIL:
1. A DRAINAGE ASSURANCE REPORT IS SUBMITTED AND APPROVED BY CITY OF TUCSON DEVELOPMENT SERVICES, ENGINEERING SECTION.
2. AN APPROVED DRAINAGE SYSYSEM IS INSTALLED FOR CAR WASHING AND DETAIL OPERATIONS.
02/11/2003 ENGINEERING - FINAL Partial Approval APPROVED FOR TEMPORARY C OF O.
RETENTION BASIN MUST BE REVITALIZED. RETENTION BASIN IS HOLDING WATER MORE THAN 24 HOURS AFTER RAINFALL. ONLY STORMWATER RUNOFF SHOULD BE ALLOWED INTO BASIN.