Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2003 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000*/ 1) JACUZZI TUB HAS BEEN SET 2) PLBG FINAL IS OK 3) OK FOR C OF O | |
| 05/13/2003 | PLUMBING - INTERMEDIATE | Partial Approval | PLEASE POST YOUR ADDRESS 2.) ABS DWV THRU ROOF OK WATER TEST OK 3.) COPPER WATER PIPE OK 4.) CLOSET FLANGES OK 5.) TUBS OK WILL NEED TO SEE TUB AFTER IT IS INSTALLED. 6.) OK TO COVER ALL AREAS. |
|
| 05/08/2003 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* 1.) MUST PROVIDE WATER TEST ON WASTE & VENT SYSTEM. 2.) COPPER BACKING FOR LAVATORY NOT ACCEPTABLE. 3.) TUB HAS NOT BEEN INSTALL @ THIS TIME. |