Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2003 | BUILDING - FINAL | Denied | IVRS - Inspection 0999* 1.) SIGNAGE OVER DOOR "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED" IS REQUIRED. 2.) IMPERMEABLE FLOOR REQUIRED IN RESTROOM. MUST EXTEND 6" ABOVE WALKING SURFACE. 3.) DOOR CLOSER ON MENS ROOM MAY HAVE NO MORE THAN 5 LB. FORCE REQUIRED FOR OPENING. 4.) DETAILS CALL FOR 2' 8' CLEAR FINISHED OPENING TO RESTROOM, YOU HAVE PROVIDED 2'9" ONLY. 5.) PROVIDE ADA/MENS ROOM SIGNAGE FOR RESTROOM. 6.) PROVIDE ELECTRIC FINAL APPROVED. |