Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
Permit Number - T03CM00227
Inspection Description - BUILDING - FINAL
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2003 | BUILDING - FINAL | Denied | IVRS - Inspection 0999* 1.) SIGNAGE OVER DOOR "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED" IS REQUIRED. 2.) IMPERMEABLE FLOOR REQUIRED IN RESTROOM. MUST EXTEND 6" ABOVE WALKING SURFACE. 3.) DOOR CLOSER ON MENS ROOM MAY HAVE NO MORE THAN 5 LB. FORCE REQUIRED FOR OPENING. 4.) DETAILS CALL FOR 2' 8' CLEAR FINISHED OPENING TO RESTROOM, YOU HAVE PROVIDED 2'9" ONLY. 5.) PROVIDE ADA/MENS ROOM SIGNAGE FOR RESTROOM. 6.) PROVIDE ELECTRIC FINAL APPROVED. |