Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/20/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST PROVIDE WATER TEST ON WASTE AND VENT SYSTEM 2) MUST STRAP DOWN GAS DROPS FOR SUSPENDED HTRS 3) CANNOT USE CLEAN OUT TEE ON A HORIZONTAL POSITION 4) SHALL REMOVE ALL INSUALTION AND DRYWALL THAT COVERS PLUMBING SYSTEM PRIOR TO INSPECTION |
|
| 07/19/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) CANNOT CONNECT A DRAIN INTO A VENT FOR E.D.F. THIS DRAIN CONNECTS TO WATER CLOSET RINGS ALLOWED 3) P-TAPE NOT APPROVED STRAP FOR GAS DROPS 4) DO NOT COVER |
|
| 07/14/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) POST YOUR ADDRESS 311.4 DRAIN TO VENT 1002 TRAPS 2) END OF BRANCH CLEANOUTS OK 3) SOUTH EAST TOILET ROOMS OK TO COVER 4) OK TO COVER ALL AREAS EXCEPT EDF AND ADJACENT TOILET ROOM 5) OK TO COVER GAS SUBJECT TO APPROVED PLAN | |
| 07/12/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE GAS ISOMETRIC WITH DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION AND INSTALL PER PLAN 2) SEE NOTES FROM 090703 WHERE ARE THE FULL SIZE CLEANOUTS? 3) ABS NOT INSTALLED PER PLAN 4) COPPER NOT INSTALLED PER PLAN 5) PLEASE HAVE PLUMBER ON SITE AT NEXT INSPECTION |