Permit: T03CM00209

Parcel: 13216921A

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
09/07/2003 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection 0000*/ 1) ABS DWV UNDERGROUND-OK. WATER TEST ONE RISER TO TEN FEET-OK 2) CONTRACTOR TO INSTALL FULL SIZE CLEANOUT AT END RUNS-WILL CHECK ON INTERMEDIATE
09/05/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ 1) DID NOT GLUE A FITTING FOR 2" VERTICAL DROP TO 4" TRUNK LINE 2) CAN NOT HAVE A FLAT FACE BUSHING IN A HORIZONTAL POSITION SEC 311.5 94 UPC INTERPETATIONS MUST USE BELL REDUCER 3) CAN NOT HAVE A FITTING IN A REVESE POSITION ON 2" 4) RE TEST SYSTEM 5) DO NOT COVER
08/29/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ 1) ALL PIPING TO BE LAID ON A FIRM BED - NO BRIDGING. 2) ALL HORIZONTAL DRAINAGE PIPING REQUIRES AT LEAST 2% PITCH. 3) VERTICAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 4) AGGREGATE CHANGE OF DIRECTION EXCEEDING 135 DEGREE REQUIRES A CLEAN OUT. 5) ALL TRAPS REQUIRE A VENT DOWNSTREAM.