Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2003 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 05/16/2003 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OK TO POUR FOOTINGS AND INSTALL DRYWALL |
| 05/12/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) INSTALL 1/2" ANCHOR BOLTS WITH 3" EMBEDMENT IN SILL PLATES WITHIN 12" OF ALL ENDS AND SPLICES AND EVERY 6' THERE AFTER. MINIMUM 2 ANCHOR BOLTS PER SILL PLATE 2) 1" CLEARANCE REQUIRED BETWEEN PORCH POSTS AND CONCRETE INSTALL 1" METAL SPACE 3) EXPOSE FOOTING ON NORTH SIDE OF ADDITION TO A DEPTH OF 12" BELOW GRADE |