Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM00177
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2004 | ENGINEERING - FINAL | Approved | C OF O APPROVED. | |
| 12/02/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1) CLEAN UP AND REMOVE LOOSE SEDIMENT ALONG CHAIN-LINK FENCE ON THE S. AND W. PARIMETERS. 2) PROVIDE ADDITIONAL RIP-RAP AT THE RETENTION/DETENTION BASIN INLET. 3) REPAIR SILT-FENCING AROUND STOCK-PILE. * RE-INSPECT ON 12/03/04 |
|
| 09/13/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. FINAL NOT TO BE GIVEN UNTIL CONSTRUCTION FOR DRAINAGE IS COMPLETED AND APPROVED. |