Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 03/14/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 03/10/2003 |
FRAMING |
|
Denied |
|
| 02/19/2003 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) ADD A FRIDGE CIRCUIT 2) CAP GAS LINE 3) CORRECT LAUNDRY LIGHT WIRING 4) INSTALL BACKFLOW VALVE ON HOSE BIB 5) ADD CIRCUIT FOR EXTERIOR LIGHT AND OUTLET-GFI PROTECTED 6) REPLACE ROTTED STRUCTURAL MEMBERS-RAFTERS, PLATES AND STUDS 7) NEED GAS PRESSURE TEST ON HOT WATER HEATER AND STOVE GAS LINES 8) INSTALL DRAIN PIPE ON TPR VALVE ON HOT WATER HEATER 9) CREATE 1" CLEARANCE TO HOT WATER FLU PIPE |