Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU03234
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 08/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | VISITED SITE. WATER BEING PUMPED FROM BASIN APPEARS TO HAVE PROPER FILTRATION. SEE ATTACHED PHOTOS. | |
| 08/18/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | COMPLAINT REGARDING WATER IN THE BASINS AND INADEQUATE TRAFFIC/ROAD IMPROVEMENTS DONNA MACLASKEY |
|
| 08/10/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | COMPLAINT REGARDING STANDING WATER-BASIN NOT DRAINING-FLOODING OF STREETS JEANINE 298-3660 |
|
| 05/31/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | The site still continues to build a few remaining homes without completing drainage issues that have already been notified via e-mail, to the respected site project managers. On going monitoring will continue to inhibit any further assurance releases until drainage issues are addressed. | |
| 12/23/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | THE STOP WORK ORDER FOR THE WESTERN 1/3 OF THE PROJECT HAS BEEN LIFTED. THE DRAINAGE REPORT HAS BEEN REVISED AND REFLECTS THE EXISTING CONDITIONS FOR ONSITE AND OFFSITE STORM WATER. NO OTHER STORM WATER CONCERNS AT THIS TIME. | |
| 06/23/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | I talked with the superintendent on site and asked him to maintain the stabilized construction entrance and to have the streets swept and or washed of fine sediment. Bill, (with landmark), said he would also have the contractors for the errosion sock perform some minor repairs. |