| 11/14/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | PER WORKFLOW REVISION HAS BEEN DENIED BY LANDSCAPE AND ZONING. MET WITH NICK ON SITE. HE ADVISED ERNIE IS MORE FAMILIAR WITH THE GRADING ISSUES. SILT FENCE ALONG NORTH PERIMETER IS IN POOR CONDITION. THE SITE HAS OTHERWISE BEEN STABILIZED BY PAVING AND OR CONCRETE. THE NORTH PORTION OF THIS SITE IS WHAT THE REVISION IS ABOUT. PER NICK PHASING NEEDS TO HAPPEN UNTIL FUNDING CAN BE OBTAINED FOR ADDITIONAL BUILDINGS AS CALLED OUT IN ORIGINAL GRADING/SITE PLAN |
|
| 09/20/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH THE CREW ON-SITE TODAY DURING AN INSPECTION FOR THE COMBO C OF O'S AND DISCUSSED THE FUTURE WORK. THE CONTRACTOR IS STILL WAITING FOR THE PLANS TO COME OUT SO THAT THEY CAN MAKE THE NECESSARY REPAIRS TO THE SWPPP CONTROLS AS NEEDED. | |
| 08/17/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME. CREW ADVISED ME THAT A NEW GRADING PLAN HAS BEEN SUBMITTED AND THAT THE CURRENT CONTROLS WILL BE CHANGED IN THE NEXT FEW WEEKS ONCE THE NEW PLAN HAS BEEN APPROVED. | |
| 07/28/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME. REMINDED THE CREWS TO WORK ON RE-ESTABLISHING THE STORMWATER CONTROLS ON THIS SITE, AND TO REPLACE THE STRAWBALES THAT HAVE DETERIORATED. | |
| 06/22/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO MAJOR STORM WATER CONCERNS AT THIS TIME. WORK IS BEING COMPLETED SLOWLY ON THE INSIDE OF EXISTING BUILDINGS. | |
| 04/08/2005 | STORMWATER FOLLOW-UP INSP | Approved | STORM WATER CONTROLS NEED MINOR REPAIR TO THE SILT-FENCING. MARTIN WITH DIVERSIFIED EXPLAINED DURING NEXT WEEK WHEN HE WAS TO HAVE A SUPERINTENDENT SCHEDULED ON-SITE HE WOULD ADDRESS THE REPAIRS AT THAT TIME. |