Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2005 | STORMWATER FOLLOW-UP INSP | Approved | CONSTRUCTION AND SITE STABILIZATION COMPLETE. | |
| 09/15/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | CLEAN UP SPILL AT THE SOUTHWEST CORNER OF BUILDING (PARKING LOT SOUTH OF BLDG.) AND PROVIDE DOCUMENTATION: 1) SPILL REPORT 2) MSDS 3) DISPOSAL OF MATERIAL. |
|
| 09/12/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 07/07/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE STORMWATER SEDIMENT AND EROSION CONTROLS AT THE NORTHWEST PERIMETER. 2. PROVIDE STORMWATE SEDIMENT AND EROSION CONTROLS AT THE NORTHWEST OUTFALL. 3. RE-NEW THE GRADING PERMIT. |
|
| 12/21/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME. |