Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2005 | STORMWATER FOLLOW-UP INSP | Approved | Contractor completed all work. | |
| 10/13/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to finish trash encloser and general clean up of site. Also supply letter from engineer in regards to drainage ways. Per city code. | |
| 09/28/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean track-out off streets. | |
| 09/13/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Clean track-out and silt off streets. Also spoke to super in regards to to basin walls. Basin walls steeper then 4 to 1 and more then 2 feet in depth need some type of barrier to keep the public out. |
|
| 09/01/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Clean all track-out and silt off streets. Talked to Wayne site super. | |
| 08/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to maintain existing stormwater controls and keep streets clean of track-out. | |
| 08/02/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1- If contractor continues to use west gate a construction entrance needs to be installed. 2- Contractor needs to stabilize east gate entrance. 3- Control track-out. |
|
| 07/11/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed issues from last visit. | |
| 02/28/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SILT FENCE INSTALLED AT THIS TIME, NO OTHER CONCERNS AT THIS TIME | |
| 02/10/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ACTIVITY ON THIS SITE ON THIS DATE. RE-SCHEDULED FOR FRIDAY 2/11/05. |