Permit: T03BU03175

Parcel: 140250580


Addresses:

1016 E MILTON RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T03BU03175

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
11/22/2005 STORMWATER FOLLOW-UP INSP Approved All area stabilized
11/10/2005 STORMWATER FOLLOW-UP INSP Approved All areas have been stabilized.
10/27/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor spreading D.G. over site.
10/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor landscaping detention basin and paved parking lot.
09/28/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean track-out off street.

Also discussed with the super the posible need of handrails around detention basins.
09/13/2005 STORMWATER FOLLOW-UP INSP Correction Required Clean track-out and silt off streets.
Spoke to super in regards to basin walls. Basin walls steeper than 4 to 1 and more then 2 feet of depth need a barrier to keep the public out.
09/01/2005 STORMWATER FOLLOW-UP INSP Correction Required Clean all track-out and silt off streets. Talked to Wayne site super.
08/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to maintain existing stormwater controls and keep streets clean of track-out.
08/02/2005 STORMWATER FOLLOW-UP INSP Correction Required 1- If contractor continues to use west gate a construction entrance needs to be installed.
2- Contractor needs to stabilize east gate entrance.
3- Control track-out.
07/11/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor addressed issues from last visit.