Permit: T03BU03091

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/19/2006 STORMWATER FOLLOW-UP INSP Approved
06/02/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORM WATER CONCERNS AT THIS TIME.
04/21/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
03/24/2005 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTIONS COMPLETE. NO STORMWATER CONCERNS.
03/17/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. SWEEP SITE AND PERIMETER STREETS.
2. PROVIDE STAKES IN STRAW BALES AND STRAW WATTLES. SEE BMP 59
03/10/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. PROVIDE STRAW BALES AT THE OUTFALL FROM BASIN #1.
2 PROVIDE AZPDES POSTING AT THE ENTRANCE.
3. PROVIDE AN UPDATED SWPPP AT THE SITE.
4. SWEEP PUBLIC STREETS AT THE PERIMETER.
03/03/2005 STORMWATER FOLLOW-UP INSP Correction Required PEPPER-VINER
XAVIER 906-9125
RICHARD 906-8032
1. PROVIDE STRAW BALES AT THE OUTFALL FROM BASIN #1.
2 PROVIDE AZPDES POSTING AT THE ENTRANCE.
3. PROVIDE AN UPDATED SWPPP AT THE SITE.
10/18/2004 STORMWATER FOLLOW-UP INSP Partial Approval SEE PREVIOUS COMMENTS. THE NORTHSIDE OF THIS SITE IS SHOWING SIGNS OF EROSION. THE SOIL THAT HAS MIGRATED FROM THE SITE NEEDS TO BE CLEANED FROM THE STREETS A.S.A.P. ANOTHER SITE INSPECTION WILL BE SCHEDULED AT A LATER DATE TO ENSURE THAT ALL STORMWATER MATERIALS ARE IN PLACE.
10/13/2004 STORMWATER FOLLOW-UP INSP Partial Approval 1. ADDRESS CONSTRUCTION ENTRANCE/EXIT LOCATED ALONG THE N. AND E. PARIMETERS. NEED TO HAVE A STABILIZED CONSTRUCTION ENTRANCE WITH 3"-4" GRAVEL TO PREVENT TRACKING OF DIRT ONTO PAVED STREETS.
2. RE-INSPECT ON MONDAY THE 18TH.
06/24/2004 STORMWATER FOLLOW-UP INSP Partial Approval This site is in good condition, no other storm water concerns at this time.