Inspection History: GRADING - FINAL

Permit Number - T03BU03084

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
06/01/2007 GRADING - FINAL Approved ALL WORK HAS BEEN COMPLETED AND ISSUES ADDRESSED
05/14/2007 GRADING - FINAL Partial Approval RESEARCH ON C OF Os
CALDWELL BANKER/LAWYER'S TITLE
PULLED PLANS WITH BETH
04/26/2007 GRADING - FINAL Partial Approval TALKED TO JOANNE WITH TL ROOF REGARDING OUTSTANDING ISSUES
PARTICIPATED IN CONFERENCE CALL WITH TL ROOF, FRYS, BASSUK BROTHERS AND GREGOR ENGINEERING TO DISCUSS DEFICIENCIES
RECEIVED WASH BASIN ABANDONMENT LETTER FROM GREGOR VIA EMAIL (SEE IMAGES)
04/19/2007 GRADING - FINAL Continued MET WITH DAVE SIROTA
NEED CERT LETTER FOR CAPPING OF WASH STATIONS
SAW APPVD DEV PLAN-STAMPED BY PATRICIA GEHLEN 3/9
04/19/2007 GRADING - FINAL Continued INSPECT FOR FINAL GRADING
04/17/2007 GRADING - FINAL Continued FINAL GRADING INSPECTION

LEFT MESSAGE FOR DAVE SIROTA
WHERE DOES DEV PLAN STAND?
TALKED TO JOANN WITH TL ROOF
02/21/2007 GRADING - FINAL Continued EMAIL TO TAMI EXPLAINING OUTSTANDING ISSUES AT SITE
02/05/2007 GRADING - FINAL Continued see pics 2005-2007
01/25/2007 GRADING - FINAL Continued SEE PICS 1984-1986
01/18/2007 GRADING - FINAL Correction Required DRAINAGE WORK BEHIND PAD 4 NOT ACCEPTABLE
THE BUBBLER BOX GRATE IS A TRAFFIC HAZZARD
SEE PICS 1942-1948
01/05/2007 GRADING - FINAL Partial Approval PADS BEING POURED FOR BIKE RACKS/LOCKERS
WORK BEING DONE ON PAD 4 DRAINAGE CONCERNS
12/28/2006 GRADING - FINAL Partial Approval PICS 1874-1880 AND FRY'S 12-28-06
12/12/2006 GRADING - FINAL Partial Approval MET ONSITE WITH STEVE GREGOR AND DAVE SIROTA TO DISCUSS PAD 4 DRAINAGE AND REDESIGN
STEVE GREGOR IS TO CONTACT PAUL MACHADO TO DISCUSS POSSIBLE CHANGES AND HIS REQUIREMENTS FOR DOCUMENTATION.
11/13/2006 GRADING - FINAL Partial Approval PICS 1651-1654 OF WALL MEETING ZONING REQUIREMENTS AND OF STORAGE CONTAINERS
TUP TO BE ISSUED BY BILL BALAK
11/09/2006 GRADING - FINAL Partial Approval WALL AT NW PL HAS BEEN BUILT
10/31/2006 GRADING - FINAL Partial Approval SEE PICS OF BIKE RACKS

TALKED TO DAVE SIROTA REGARDING BIKE LOCKERS

TALKED TO CHAD WITH WALL COMPANY REGARDING CONCRETE SPILLED ON ASPHALT AND IN ALLEYWAY
10/30/2006 GRADING - FINAL Partial Approval MET WITH DAVE SIROTA DOWNTOWN
PER DAVE: PATRICIA GEHLEN WILL ALLOW BIKE RACKS TO BE MOVED AND CHANGE MADE ON DEV PLAN

SPOKE TO JOANN WITH TL ROOF AND ADVISED OUTSTANDING ISSUES ARE NOT RELATED TO TL ROOF. ALL ISSUES LEFT ARE EITHER RIO WEST, GREGOR & GRENIER, FRY'S OR BASSICK BROTHERS.
10/16/2006 GRADING - FINAL Partial Approval STORAGE CONTAINERS STILL ON SITE
10/13/2006 GRADING - FINAL Partial Approval RCVD BASIN CERTIFICATION LETTER
10/06/2006 GRADING - FINAL Partial Approval ALL ISSUES ON PUNCH LIST HAVE BEEN ADDRESSED

EXCEPT:
-BIKE PARKING- DAVE SIROTA IS WORKING WITH ZONING (MICHAEL ST. PAUL AND DAVID RIVERA)
-FRY'S NEEDS TO MOVE STORAGE CONTAINERS AT WEST SIDE OF BUILDING
-DRAINAGE ISSUE WITH BLDG 4 (VET CLINIC) MUST BE ADDRESSED RIO WEST
-BASIN CERTIFICATION NEEDS TO BE RECEIVED BEFORE FINAL APPROVAL
10/05/2006 GRADING - FINAL Continued TALKED TO JO ANN WITH TL ROOF
-DISCUSSED FINAL GRADING REQUEST FOR 10/6
-DAVE SIROTTA IS STILL WORKING ON BIKE PARKING
-FRY'S STILL NEEDS TO MOVE STORAGE CONTAINERS
-RIO WEST STILL NEEDS TO ADDRESS DRAINAGE CONCERNS AT VET CLINIC
-CALLED BILL POTTER WITH FINA AND ADVISED HIS C OF O MAY BE DIFFICULT AS RIO WEST HAS NOT ADDRESSED CONCERNS FOR THE SHELL (VET CLINIC)
10/04/2006 GRADING - FINAL Continued RCVD PHONE CALL FROM TL ROOF AFTER 5 PM 10/3 REQUESTING CONTACT INFORMATION FOR PARKS AND REC FOR SIGN OFF ON WALK WAY INSTALLED AS PART OF PIA

SENT EMAIL TO GLENN HICKS AND ROBERT JUST
10/03/2006 GRADING - FINAL Not ready for Inspection LOOKED AROUND SITE
PAD HAS BEEN STABILIZED
DG IS STOCKPILED AT TRASH ENCLOSURES FOR DRAINAGEWAY
BIKE PARKING NOT YET ADDRESSED
STORAGE CONTAINERS STILL WEST OF FRYS
09/27/2006 GRADING - FINAL Not ready for Inspection MET ONSITE WITH TL ROOF, GREGOR & GRENIER, FRYS, PROPERTY MANAGER

BIGGER DG TO BE PLACED AT WEST SIDE OF WEST DRAINAGEWAY
STORAGE CONTAINERS ARE TO BE REMOVED
BICYCLE PARKING MUST BE APPROVED BY ZONING
BASIN CERTIFICATION LETTER REQUESTED
DIRT IN NW BASIN TO BE REMOVED
09/05/2006 GRADING - FINAL Correction Required PICS 1305-1308

SAGUARO SPECIALTIES MIKE DAWSON 891-3012

WASH OUT AND GENERAL MESS TO CLEAN UP
CALLED AND LEFT MESSAGE FOR MIKE
MIKE CALLED BACK-WE DISCUSSED THE REVISION TO THE GRADING AND THE CLEAN UP WORK THAT IS REQUIRED OF HIS CREWS
08/31/2006 GRADING - FINAL Not ready for Inspection MET ON SITE WITH TOMMY ROOF AND DAVE SIROTTA

OUTSTANDING ISSUES ON GRADING PUNCH LIST WERE COVERED

PER TOMMY ROOF ALL ITEMS SHOULD BE COMPLETE BY END OF SEPTEMBER
08/25/2006 GRADING - FINAL Not ready for Inspection DRAINAGEWAY HAS HAD WORK DONE THAT DOES NOT CONFORM WITH THE PLANS SHOWN TO ME. WILL TAKE PICTURES AND SEND TO LAITH

MET WITH RIO WEST BRAD HOGE 977-8336 REGARDING SHELLS ON SITE. MADE BRAD AWARE THAT THE VET CLINIC IS NOT BUILT PER PLAN-DRAINAGE CHANGES POSS ELEVATION CHGS NEED TO BE REVIEWED
06/01/2006 GRADING - FINAL Not ready for Inspection T03BU03084 10249 E. Rita Rd
Fry's Shoppes at Rita Ranch

June 1, 2006

PRELIMINARY PUNCHLIST ONLY

1. General clean up of site and drainageway along south side of project
2. Any slopes steeper than 3:1 need to be addressed and re-established or stabilized
3. Basin certification letter from the Engineer of Record must be received

Sheet 4:
1. Two additional curb cuts, pipe, drainage grate structure have all been placed at the southeast side of Pad 4. These are not on the grading plan or the associated building permit (T05CM03886 8110 S. Houghton Rd.) for this pad.
2. Note #12 between Pad 5 and Pad 6 no vertical curb was placed
3. Note #3 loading space not built (Have the changes to this area been addressed through Development Services and reviewed?)
4. Notes # 4 and #11 have not been completed. Place bicycle parking as called out in plan.

Sheet 5:
1. Clean up and stabilize Pad 2
2. Reflect changes for items not built or installed per plan for as-builting/phasing in order to close out this grading permit.

Sheet 9:
1. At gate opening/depressed curb area provide scour/erosion protection.


Sheet 8:
1. Create rip-rap splash pad or other scour preventative at all depressed curb openings/basin inlets.
05/31/2006 GRADING - FINAL Not ready for Inspection MET WITH DOUG WITH TL ROOF

WILL DO A PRELIMINARY PUNCHLIST FOR ENTIRE SITE
DRAINAGEWAY IMPROVEMENTS/CHANGES HAVE BEEN APPROVED AND STAMPED BY PAUL MACHADO--NO COPY OF REVISION RCVD BY ME
CHANGES TO DRAINAGE AT SOUTH SIDE OF PAD 4 NOT SHOWN/APPROVED ON GRADING PLAN
07/26/2005 GRADING - FINAL Denied PERLIMINARY FINAL GRADING PUNCH LIST
DATE: 07/26/05
NOTE: Not to be considered a complete final grading punch list.

1) Complete drainage swell construction along the West perimeter property line. Complete rock-rip-rap installation within the outflow.
2) Provide roof drain erosion protection at the NE corner of the building. Convey roof drain run-off to the N. and into retention/detention basin.
3) Observed ponding within catch basin at the outlet located on the West end of the channel. Grade retention/detention basin to allow positive drainage of catch basin.
4) Backfill dirt along curb at the NE entrance and provide compaction to prevent erosion on the S side of the very NE entrance.
5) Level all dirt within islands on Houghton and remove all construction debris.
6) Provide erosion protection along the second entrance from the NE into Fry's shopping center.
7) Clean up and remove all large construction rocks, concrete, rebar, survey stakes etc.
8) Level decorative rock and add additional decorative rock along the fence line of the retention/detention basin.
9) Back fill screen wall along Houghton Rd.
10) Replace all fallen down signs along Houghton Rd. and Rita Rd.
11) Complete installation of 6" reveal curb for lots 2 and 3.
12) Provide all pedestrian striping within Fry's parking lot as shown on plans.
13) Sediment observed to be eroding from lot 2, provide SWPPP controls.
14) Repair or replace SWPPP controls along the Southern perimeter adjacent to the wash.
15) Back-fill dirt along sidewalk on Rita just West of Rita Entrance to prevent trip hazard.
06/17/2005 GRADING - FINAL Partial Approval Met with contractor on-site to approve site for temporary C of O. Contractor has completed all items that Jason had requested. All access drives are complete and opperational, the drive isle around the building is open and free of construction debris. the fence around drainage basin is complete.
06/15/2005 GRADING - FINAL Not ready for Inspection SITE WAS INSPECTED TO MAKE SURE THAT OUR IDEAS AND CONTRACTOR IDEAS WERE ON THE SAME PAGE TO BE ABLE TO OBTAIN A TEMPORARY C OF O FOR GRAND OPENING ON FRIDAY THE 17TH.
06/13/2005 GRADING - FINAL Not ready for Inspection SITE WAS INSPECTED FOR A TEMPORARY C OF O FOR A GRAND OPENING ON FRIDAY THE 17TH. NOTIFIED THE SUPERINTENDENT OF WHAT IS NEEDED TO ACHIEVE A TEMP C OF O. THE SITE WILL BE VISITED TODAY TO FOLLOW UP ON PROGRESS OF REQUESTED PUNCH LIST ITEMS.