Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU03084
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2006 | STORMWATER FOLLOW-UP INSP | Approved | ALL PADS STABILIZED | |
06/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | ASPHALT TO BE PLACED STILL FINAL STAGES OF CONSTRUCTION FOR THE GAS PUMPS |
|
04/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | BEST PAVING ON SITE STARTING WORK ON GAS PUMPS DAMITIO CONSTRUCTION DOING THE WORK-NO PERMIT ON SITE-WILL RETURN FOR PERMIT AND PLANS ON-SITE VERIFICATION 4/25 |
|
02/01/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | WORK HAS STOPPED ON DRAINAGE WAY ON WEST SIDE OF SITE. PARTIALLY RIP RAPPED AND EXTRA ROCK HAS BEEN STOCKPILED ON SIDEWALK | |
01/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | GROUTED RIP RAP IN N/S DRAINAGEWAY ON WEST SIDE OF SHOPPING CENTER IS NOT PART OF AN APPROVED SET OF PLANS. PROCEED AT YOUR OWN RISK. GIVEN TO SAGUARO SPECIALITES(LLOYD'S CREW LEAD) |
|
01/25/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CALLED DOUG AND ADVISED NO REVISION HAS BEEN SHOWN TO THE REVIEW ENGINEER. ALSO ADVISED ANY CHANGES WILL NEED TO BE REVIEWED BY LANDSCAPE AND ZONING TO ENSURE COMPLIANCE. | |
01/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | DOUG (TL ROOF 591-6650) 9/23/05 GREGOR DREW NEW DETAIL FOR GUNITE OF WEST DRAINAGE NEW WILL HAVE HAND PLACED GROUTED RIP RAP. TO BE SUBMITTED TO COT ENGINEERING. | |
01/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | LEFT MESSAGE FOR TOMMY AT TL ROOF 792-0734 FOR CONTACT INFORMATION. DRAINAGEWAY CONCERNS MUST BE ADDRESSED BEFORE FINAL GRADING AND SHELL C OF O'S | |
01/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH TOMMY ROOF. HE IS TO HAVE A SITE SUPER CALL ME TO DISCUSS THE DRAINAGEWAY ALONG THE WEST SIDE OF THE SITE. I AM HOPING TO MEET AND DISCUSS THE STANDING WATER AND REGRADING THE DRAINAGE FOR POSITIVE FLOW TO DRAINAGEWAY AT THE NW CORNER OF THE PROJECT | |
01/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE CONTINUES TO BUILD OUTSTANDING CONCERNS REGARDING DRAINAGE ALONG WEST SIDE OF PROPERTY. MAY NEED TO BE REGRADED TO PROVIDE POSITIVE FLOW. STANDING WATER AND DEBRIS IN DRAINAGEWAY. |
|
03/09/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO MAJOR STORM WATER CONCERNS FOR THIS SITE AT THIS TIME. ON-GOING INVESTIGATION AT THIS TIME CONCERNING THE NEIGHBORS PERIMETER WALL. | |
02/17/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME. | |
01/19/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. DOUG 591-6650 |
|
01/06/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE MORE GRAVEL ON THE CONSTUCTION ENTRANCE AND CLEAN UP THE TRACKED MATERIAL. |