Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03BU03084


Addresses:

10249 E RITA RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T03BU03084

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
10/17/2006 STORMWATER FOLLOW-UP INSP Approved ALL PADS STABILIZED
06/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval ASPHALT TO BE PLACED STILL
FINAL STAGES OF CONSTRUCTION FOR THE GAS PUMPS
04/24/2006 STORMWATER FOLLOW-UP INSP Partial Approval BEST PAVING ON SITE STARTING WORK ON GAS PUMPS
DAMITIO CONSTRUCTION DOING THE WORK-NO PERMIT ON SITE-WILL RETURN FOR PERMIT AND PLANS ON-SITE VERIFICATION 4/25
02/01/2006 STORMWATER FOLLOW-UP INSP Partial Approval WORK HAS STOPPED ON DRAINAGE WAY ON WEST SIDE OF SITE. PARTIALLY RIP RAPPED AND EXTRA ROCK HAS BEEN STOCKPILED ON SIDEWALK
01/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval GROUTED RIP RAP IN N/S DRAINAGEWAY ON WEST SIDE OF SHOPPING CENTER IS NOT PART OF AN APPROVED SET OF PLANS. PROCEED AT YOUR OWN RISK.
GIVEN TO SAGUARO SPECIALITES(LLOYD'S CREW LEAD)
01/25/2006 STORMWATER FOLLOW-UP INSP Correction Required CALLED DOUG AND ADVISED NO REVISION HAS BEEN SHOWN TO THE REVIEW ENGINEER. ALSO ADVISED ANY CHANGES WILL NEED TO BE REVIEWED BY LANDSCAPE AND ZONING TO ENSURE COMPLIANCE.
01/11/2006 STORMWATER FOLLOW-UP INSP Correction Required DOUG (TL ROOF 591-6650) 9/23/05 GREGOR DREW NEW DETAIL FOR GUNITE OF WEST DRAINAGE NEW WILL HAVE HAND PLACED GROUTED RIP RAP. TO BE SUBMITTED TO COT ENGINEERING.
01/09/2006 STORMWATER FOLLOW-UP INSP Correction Required LEFT MESSAGE FOR TOMMY AT TL ROOF 792-0734 FOR CONTACT INFORMATION. DRAINAGEWAY CONCERNS MUST BE ADDRESSED BEFORE FINAL GRADING AND SHELL C OF O'S
01/09/2006 STORMWATER FOLLOW-UP INSP Correction Required SPOKE WITH TOMMY ROOF. HE IS TO HAVE A SITE SUPER CALL ME TO DISCUSS THE DRAINAGEWAY ALONG THE WEST SIDE OF THE SITE. I AM HOPING TO MEET AND DISCUSS THE STANDING WATER AND REGRADING THE DRAINAGE FOR POSITIVE FLOW TO DRAINAGEWAY AT THE NW CORNER OF THE PROJECT
01/06/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE CONTINUES TO BUILD

OUTSTANDING CONCERNS REGARDING DRAINAGE ALONG WEST SIDE OF PROPERTY. MAY NEED TO BE REGRADED TO PROVIDE POSITIVE FLOW. STANDING WATER AND DEBRIS IN DRAINAGEWAY.
03/09/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO MAJOR STORM WATER CONCERNS FOR THIS SITE AT THIS TIME. ON-GOING INVESTIGATION AT THIS TIME CONCERNING THE NEIGHBORS PERIMETER WALL.
02/17/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME.
01/19/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
DOUG 591-6650
01/06/2005 STORMWATER FOLLOW-UP INSP Correction Required PROVIDE MORE GRAVEL ON THE CONSTUCTION ENTRANCE AND CLEAN UP THE TRACKED MATERIAL.