Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T03BU03084
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2004 | STORMWATER INSTALL OF CONTROLS | Approved | ||
11/15/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | STORM WATER CONCERNS HAVE BEEN ADDRESSED AND CORRECTIONS MADE. CONCRETE WASH OUT AREA IS TO BE CONSTRUCTED OVER THE NEXT WEEK. RE-INSPECT TOWARDS THE END OF NOVEMBER. | |
11/08/2004 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1. PROVIDE A CONCRETE WASH-OUT AREA. 2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 3. UPDATE THE SWPPP FOR ALL MODIFICATIONS. 4. STAKE STRAW BALES WITH (2) STAKES EACH AT THE SOUTHWEST CORNER OF THE PROJECT AND AT THE WEST OUTFALL. DOUG 591-6650 |
|
11/01/2004 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1. PROVIDE SEDIMENT AND EROSION CONTROL AT THE WEST OUTFALL INTO THE DRAINAGE CHANNEL. 2. PROVIDE POSITIVE DRAINAGE ON THE WEST PERIMETER TO THE OUTFALL. 3. POST THE AZPDES AUTHORIZATION SIGN AT THE SITE ENTRANCE. 4. PROVIDE A CONCRETE WASH-OUTAREA. 5. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 6. UPDATE THE SWPPP FOR ALL MODIFICATIONS. |