Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T03BU03081
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2005 | GRADING - FINAL | Approved | ||
01/27/2005 | GRADING - FINAL | Denied | 1. COMPLETE ALL REPAIRS TO THE RETENTION/DETENTION BASIN WEST OF THE BUILDING. REPAIR EROSION DAMAGE ON THE ACCESS RAMP AND REMOVE SEDIMENT DEPOSITS IN THE BASIN. 2. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |
|
01/26/2005 | GRADING - FINAL | Cancelled | CONTRACTOR CANCELED, NOT READY FOR INSPECTION DUE TO RAIN. | |
01/21/2005 | GRADING - FINAL | Denied | PROVIDE A REVISED AND APPROVED GRADING PLAN TO SHOW THE BLEED PIPE CONSTRUCTION. | |
09/22/2004 | GRADING - FINAL | Denied | RE-ESTABLISH THE PERCOLATION RATES IN THE WESTERN BASIN TO LESS THAN 24 HOURS. | |
09/20/2004 | GRADING - FINAL | Denied | 1) COMPLETE CURB PLACEMENT WEST OF THE TRASH ENCLOSURE AND PROVIDE VERIFICATION THAT THE ROCK RIPRAP IN THE DRAINAGE ENTRANCE IS PLACED ON THE FILTER FABRIC. 2) DETENTION/RETENTION BASIN DOES NOT DRAIN IN THE REQUIRED TIME FRAME. PROVIDE INFORMATION FROM THE SITE ENGINEER TO VERIFY THAT THIS PROBLEM HAS BEEN RESOLVED. 3) REMOVE ALL REMAINING STORMWATER CONTROLS. |
|
09/17/2004 | GRADING - FINAL | Partial Approval | 1. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. REPAIR CURB AT TRASH ENCLOSURE ON SOUTHWEST SIDE OF PROJECT. |
|
09/02/2004 | GRADING - FINAL | Denied | 1. REPAIR EROSION DAMAGE AT THE OUTFALL ON THE NORTH PERIMETER. 2. COMPLETE ALL SITE WORK FOR DRAINAGE AND THE RETENTION/DETENTION BASIN INCLUDING: ROCK RIP-RAP WITH FILTER FABRIC, BOLLARDS, ACCESS RAMP AND ALL BARRICADE RAILINGS. |
|
08/13/2004 | GRADING - FINAL | Denied | 1. ASPHALT SURFACE MUST MEET EXISTING GRADE AT THE SOUTHEAST ENTRANCE. 2. ADDRESS THE RUN-ON WATER AT THE SCUPPER ON THE SOUTH PERIMETER, AND THE EROSION DAMAGE AT THE OUTFALL ON THE NORTH PERIMETER WITH DAVID ROBERTS 349-7643. 3. PROVIDE BICYCLE PARKING AND HANDICAP PARKING SIGNS. 4. COMPLETE ALL SITE WORK FOR DRAINAGE AND THE RETENTION/DETENTION BASIN INCLUDING: ROCK RIP-RAP WITH FILTER FABRIC, BOLLARDS, ACCESS RAMP AND ALL BARRICADE RAILINGS. |