Permit: T03BU03081

Parcel: 137055210


Addresses:

1213 W IRVINGTON RD


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T03BU03081

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/28/2005 GRADING - FINAL Approved
01/27/2005 GRADING - FINAL Denied 1. COMPLETE ALL REPAIRS TO THE RETENTION/DETENTION BASIN WEST OF THE BUILDING. REPAIR EROSION DAMAGE ON THE ACCESS RAMP AND REMOVE SEDIMENT DEPOSITS IN THE BASIN.
2. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
01/26/2005 GRADING - FINAL Cancelled CONTRACTOR CANCELED, NOT READY FOR INSPECTION DUE TO RAIN.
01/21/2005 GRADING - FINAL Denied PROVIDE A REVISED AND APPROVED GRADING PLAN TO SHOW THE BLEED PIPE CONSTRUCTION.
09/22/2004 GRADING - FINAL Denied RE-ESTABLISH THE PERCOLATION RATES IN THE WESTERN BASIN TO LESS THAN 24 HOURS.
09/20/2004 GRADING - FINAL Denied 1) COMPLETE CURB PLACEMENT WEST OF THE TRASH ENCLOSURE AND PROVIDE VERIFICATION THAT THE ROCK RIPRAP IN THE DRAINAGE ENTRANCE IS PLACED ON THE FILTER FABRIC.
2) DETENTION/RETENTION BASIN DOES NOT DRAIN IN THE REQUIRED TIME FRAME. PROVIDE INFORMATION FROM THE SITE ENGINEER TO VERIFY THAT THIS PROBLEM HAS BEEN RESOLVED.
3) REMOVE ALL REMAINING STORMWATER CONTROLS.
09/17/2004 GRADING - FINAL Partial Approval 1. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
2. REPAIR CURB AT TRASH ENCLOSURE ON SOUTHWEST SIDE OF PROJECT.
09/02/2004 GRADING - FINAL Denied 1. REPAIR EROSION DAMAGE AT THE OUTFALL ON THE NORTH PERIMETER.
2. COMPLETE ALL SITE WORK FOR DRAINAGE AND THE RETENTION/DETENTION BASIN INCLUDING: ROCK RIP-RAP WITH FILTER FABRIC, BOLLARDS, ACCESS RAMP AND ALL BARRICADE RAILINGS.
08/13/2004 GRADING - FINAL Denied 1. ASPHALT SURFACE MUST MEET EXISTING GRADE AT THE SOUTHEAST ENTRANCE.
2. ADDRESS THE RUN-ON WATER AT THE SCUPPER ON THE SOUTH PERIMETER, AND THE EROSION DAMAGE AT THE OUTFALL ON THE NORTH PERIMETER WITH DAVID ROBERTS 349-7643.
3. PROVIDE BICYCLE PARKING AND HANDICAP PARKING SIGNS.
4. COMPLETE ALL SITE WORK FOR DRAINAGE AND THE RETENTION/DETENTION BASIN INCLUDING: ROCK RIP-RAP WITH FILTER FABRIC, BOLLARDS, ACCESS RAMP AND ALL BARRICADE RAILINGS.