Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 01/28/2005 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
|
| 08/13/2004 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
NO STORMWATER CONCERNS. |
| 07/07/2004 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
SITE IS FAIRLY STABLE WITH NO STORM WATER CONTROLS. THE RETENTION/ DETENTION BASIN IS IN PROGRESS, HOWEVER IT IS STILL VERY ROUGH GRADE. PERODIC INSPECTIONS WILL BE OCCUR FOR THIS SITE. |
| 06/09/2004 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
This site has some concerns on their retention/detention basin design and drainage. The site has SWPPP controls located at the Northern end of the project before entering the retention/detention basin. No other storm water concerns at this time. |