Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T03BU02830
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2005 | GRADING - FINAL | Approved | John approved this today as. May 16th 2005 computer was not updated | |
05/16/2005 | GRADING - FINAL | Approved | ||
04/11/2005 | GRADING - FINAL | Denied | SEE NOTE #10 OF PREVIOUS INSPECTION. PROVIDE (2) TYPE "B" POST BARRICADES AT 5' ON CENTER AT EACH END OF BICYCLE PATH ON SOUTH SIDE OF PROJECT AS SHOWN ON THE PIA AND GRADING PLANS. |
|
04/07/2005 | GRADING - FINAL | Denied | DENIED, ALL ITEMS ON THE ESTABLISHED PUNCH LIST HAVE NOT BEEN COMPLETED. | |
03/02/2005 | GRADING - FINAL | Denied | 1. PROVIDE REVISED GRADING AND DEVELOPMENT PLANS FOR REVIEW AND APPROVAL BY THE CITY OF TUCSON ENGINEERING AND ZONING DIVISIONS THAT SHOWS ALL REVISIONS AND MODIFICATIONS. 2. COMPLETE ALL ROOF DOWNSPOUT EXTENSIONS PER DETAIL J, PAGE 2. 3. PROVIDE A TYPE 2 SIDEWALK SCUPPER NEAR THE NORTHEAST CORNER OF BLDG. 2, AS SHOWN ON THE PLAN, OR PROVIDE REVISED AND APPROVED GRADING AND DEVELOPMENT PLANS. 4. PROVIDE REVISED AND APPROVED GRADING AND DEVELOPMENT PLANS SHOWING THE MODIFICATIONS TO THE BICYCLE PARKING. 5. PROVIDE THE RETAINING WALL AT THE SOUTHEAST CORNER OF BUILDING 2. KEYNOTE 26, PAGE 2. 6. PROVIDE 42" HIGH BARRICADE RAILING EAST OF BUILDING 3 KEYNOTE 25, PAGE 2. 7. ADDRESS THE SIDEWALK ACCESS TO NORRIS AVENUE BETWEEN BUILDINGS 3 & 4. 8. ADDRESS THE STEEP SLOPE SOUTHEAST OF BLDG 4. DETAIL K, SHEET 4. 9. PROVIDE THE RETAINING WALL AND SLOPE TREATMENT AT THE SOUTHWEST CORNER OF BUILDING 1. SEE KEYNOTE 26 AND TYPICAL SLOPE TREATMENT NOTE. 10. PROVIDE (2) BOLLARDS AT BOTH THE EAST AND WEST ENDS OF THE PAVED BICYCLE PATH ON THE SOUTH PERIMETER OF SITE. NO KEYNOTE WAS SHOWN ON THE PLAN. 11. REPAIR THE DAMAGED CURB AT THE SOUTHWEST CORNER OF THE SOUTHWEST GAS FACILITY AND AT THE INLET TO THE EXISTING CURB INLET ON THE SOUTH PERIMETER. 12. CLEANUP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS AT THIS SITE. 13. PROVIDE AN ARIZONA REGISTERED PROFESSIONAL ENGINEER'S CERTIFIED INSPECTION REPORT FOR THE DRAINAGE AND DETENTION/RETENTION FACILITIES. SEE GRADING PLAN PAGE 1, MAINTENANCE OF DETENTION/RETENTION FACILITIES NOTE 2. |
|
04/06/2004 | GRADING - FINAL | Not ready for Inspection | 1. UNDERGROUND RETENTION/DETENTION BASIN IS APPROXIMATELY 90% COMPLETE. WESTERN TECH WILL BE PERFORMING COMPACTION TESTS ON BACKFILL AND PROVIDE RESULTS TO THE CONTRACTOR AND DSD REVIEW. | |
04/06/2004 | GRADING - FINAL | Not ready for Inspection | Not ready for inspection. 1. Under ground retention/detention basin has been completed. Western Tech was on site and performing their compaction test. 2. I informed Lyal with Triumph not to call in another inspection until he has completed additional drainage channels and pipes to tie into the underground retention/detention basin. |
|
04/01/2004 | GRADING - FINAL | Not ready for Inspection | 1. UNDERGROUND RETENTION/DETENTION BASIN IS APPROXIMATELY 90% COMPLETE. WESTERN TECH WILL BE PERFORMING COMPACTION TESTS ON BACKFILL AND PROVIDE RESULTS TO THE CONTRACTOR AND DSD REVIEW. | |
03/30/2004 | GRADING - FINAL | Denied | C OF O DENIED. 1. SITE NOT READY FOR INSPECTION DUE TO NEEDED INSPECTION FOR BACKFILL AND COMPACTION PER APPROVED PLANS. |
|
03/26/2004 | GRADING - FINAL | Not ready for Inspection | PARTIAL APPROVAL FOR R/D BASIN EXCAVATION LINED WITH FILTER FABRIC AND 2.5' BEDDING OF PEA GRAVEL. WEST END EXCAVATION IN PROGRESS FOR FULL 240' LENGTH. | |
03/23/2004 | GRADING - FINAL | Not ready for Inspection | PARTIAL APPROVAL FOR 9.5 X 10' X 240' R/D BASIN EXCAVATION. | |
03/16/2004 | GRADING - FINAL | Not ready for Inspection | PARTIAL APPROVAL FOR UNDERGROUN R/D BASIN EXCAVATION. CALL FOR INSPECTION WHEN FILTER FABRIC IS INSTALLED. |