Inspection History Details
Inspection Status: Continued
Inspection History: GRADING - FINAL
Permit Number - T03BU02623
Inspection Description - GRADING - FINAL
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/11/2012 | GRADING - FINAL | Continued | MET WITH CHIP YETZER ONSITE AND LOOKED OVER TOO SEE WHAT IS BEING DONE ON THIS SITE AT THIS TIME. WORK IS BEING DONE ON 3 LOTS AT THIS TIME, BUT NO WORK IS HAPPENING IN REGARDS TO THIS PERMIT. ADVISED CHIP THAT WE HAVE RECEIVED THEIR AS-BUILT DRAWINGS FOR THIS SITE BUT THEY HAVE NOT BEEN APPROVED AT THIS TIME. ALSO WE ARE WAITING FOR AS-BUILT DRAWINGS TO BE PROVIDED BY THE ORIGINAL OWNER OF THE SITE FOR ALL AREAS OUTSIDE THE CHIPS PORTION OF THE SITE | |
11/01/2012 | GRADING - FINAL | Continued | THE FOLLOWING LOTS HAVE BEEN WORKED ON IN THE FOLLOWING MANNER AT THIS TIME: LOTS 1 - 10 NOTHING HAPPENING IN THIS AREA, LOTS 1 & 12 ARE COMPLETE AND SOLD, LOTS 13 &14 HAVE STAKES LAID OUT FIOOR THE FLOOR SLAB AND EXCAVATING IS HAPPEING IN VARIOUS AREAS FOR THE FOOTERS AND PLUMBING. LOTS 15 THRU 17 HAVE HAVE BEEN COMPLETED, LOTS 18 THRU 23 NOTHING HAPPENING, LOT 24 HAS THE FLOOR SLAB AND WALLS COMPLETE, LOT 25 NOTHING HAPPENING. | |
08/23/2012 | GRADING - FINAL | Continued | NO WORK AT THIS TIME. | |
07/11/2012 | GRADING - FINAL | Continued | C REW CONTINUES TO WORK ON THE INSTALLATION OF THE GABION BASKETS ALONG THE WEST SIDE OF THE WASH. STILL WAITING FOR APPROVED DRAWINGS SHOWING THE CHANGES THAT HAVE BEEN MADE TO THE LAYOUT AND THE LENGTH OF THE GABION AREA. I WILL BE MEETING WITH THE ENGINEER OF RECORD AND ELIZABETH LIEBOLD TOMORROW TO DISCUSS THE CHANGES THAT HAVE BEEN NOTED TO THE SITE AND WHAT IS NEEDED AT THIS TIME TOO ENSURE THAT THE SITE WILL CLOSE IN AN ACCEPTAE MANNER IN THE FUTURE. | |
07/10/2012 | GRADING - FINAL | Continued | MET WITH ART AND TONY FROM THE CITY OF TUCSON INSPECTION DEPT AND DISCUSSED WHAT IS CURRENTLY HAPPENING ON THE SITE AND THE CHANGES THAT HAVE BEEN MADE TOO THE APPROVED PLANS. TONY AND GREGG DISCUSSED THE CHANGES THE OTHER DAY AND AGREED THAT THESE CHANGES COULD BE HANDLED IN THE SUBMITTAL OF THE ASBUILT DRAWINGS. I REMINDED THEM THAT ANY CHANGES TO THE APPROVED PLANS NEED TO BE ADDRESSED WITH THE ENGINEERING AND ZONING SECTIONS PRIOR TO IMPLEMENTATION IN THE FIELD, NUT THAT THEY ARE JUST ACCEPTED AFTER THE FACT. | |
07/06/2012 | GRADING - FINAL | Continued | MET WITH ART RODRIGUEZ FROM DESERT EARTH, THEY ARE WORKING ON THE INSTALLATION OF THE GABION BASKETS ALONG THE WEST SIDE OF THE WASH EAST OF THE WEST ENTRANCE INTO THE SITE. I HAVE ASKED HIM WHY IT APPEARS THAT THE GABIONS HAVE BEEN SHORTENED BY ABOUT 50% FROM WHAT IS CALLED OUT ON THE APPROVED PLANS. HE ADVISED ME THAT THE ENGINEER OF RECORD FOR THIS SITE HAS MADE MODIFICATIONS TO THE LAYOUT. I ASKED THAT HE HAVE THE ENGINEER OF RECORD CONTACT ME ABOUT THIS CHANGE, I NEED REVISED APPROVED DRAWINGS BEFORE WE WILL ACCEPT THESE CHANGES. CHANGES OF THIS NATURE MAY NOT BE ACCEPTED BY THIS DEPARTMENT, SO I WANT TO MAKE SURE THAT WE DO NOT HAVE TO REDO WORK IN THE FUTURE IF POSSIBLE. | |
05/01/2012 | GRADING - FINAL | Not ready for Inspection | CREWS WILL BE WORKING TO RE-ESTABLISH THIS SITE FOR FUTURE CONSTRUCTION IN THE FOLLOWING 2 WEEKS. THEN THEY WILL BE MOVING BACK INTO CONSTRUCTION ONCE ALL PERMITS HAVE BEEN OBTAINED FOR ALL FUTURE WORK AND EVERYTHING IS IN ISSUED STATUS. | |
05/24/2005 | GRADING - FINAL | Correction Required | Met with John Martinez at the site to discuss stockpiles and stromwater controls. John said that they would have a crew on-site 5/25 to start work again. | |
03/26/2004 | GRADING - FINAL | Not ready for Inspection | DISCUSSED SWPPP CONTROLS WITH BOB ROSE (406-8907) SITE SUPERINTENDENT FOR TANQUE VERDE EQUIPMENT. |