Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU02490
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
01/13/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | STORM WATER FOLLOW-UP INSPECTION CORRECTION REQUIRED: 1) REPAIR AND RE-INSTALL STORM WATER CONTROLS LOCATED AT THE N. AND N.W. PARIMETERS OF THE PROJECT. WALKED THE SITE WITH CHUCK MCGULLAM (488-6277) AND DISCUSSED SOME OF THE STORM WATER INSTALLATIONS REGARDING RETENTION/DETENTION BASINS AND DRAINAGE PIPES. REQUESTED CHUCK TO CALL BACK A RE-INSPECTION FOR THE CORRECTIONS NEEDED ON THE STORM WATER CONTROLS. |
|
08/13/2004 | STORMWATER FOLLOW-UP INSP | Approved | SITE IS IN COMPLIANCE WITH ALL APPROPRIATE SWPPP REQUIREMENTS. |