Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2005 | GRADING - FINAL | Approved | ||
| 03/11/2005 | GRADING - FINAL | Denied | 1. PROVIDE 3:1 SLOPES ON RETENTION/DETENTION BASIN WEST OF BUILDING. SEE KEYNOTE 4. 2. CONSTRUCT RIP RAP SPILLWAY PER PLAN DETAIL 15, SHEET C3.4. KEYNOTE 31 3. PROVIDE CONCRETE SPLASH BLOCKS AT DOWNSPOUTS AS INDICATED ON THE PLAN. KEYNOTE 27 4. PROVIDE (2) STOP BARS AT THE NORTH ENTRANCE DRIVES. SEE KEYNOTE 25 & 50 5. PROVIDE NO PARKING SIGNS AT THE SOUTHEAST CORNER OF SITE. 6. GRADE THE EARTHEN SWALE TO DAYLIGHT A 1% MIN. NEAR SOUTH PERIMETER. KEYNOTE 15 7. PROVIDE ENGINEERS REPORT FOR R/D BASIN. SEE NOTE 2 PAGE C-3.4 8. PROVIDE SOLID LID FOR SERVICE MANHOLE. |