Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 01/06/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SWEEP SEDIMENT FROM PUBLIC RIGHT OF WAY. 2. SUBGRADE IS BEING PREPARED. CONTRACTOR WILL SWEEP STREETS TO CONTROL TRACKING IN LIEW OF GRAVEL ENTRANCE. CURRENTLY ENTRANCES ARE AB HARDPACKED. |
|
| 11/30/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | CORRECTIONS HAVE BEEN MADE. | |
| 11/24/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | PARTIAL CORRECTION HAS BEEN MADE, SILT FENCING HAS BEEN INSTALLED ON THE DOWN GRADIENT PORTION OF THE SITE. 1. PROVIDE GRAVEL AT STABILIZED CONSTRUCTION ENTRANCES. |
|
| 11/17/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | CONCORD CONSTRUCTION-TOM EINWECK 419-3907 1. PROVIDE THE SWPPP CONTROLS PER SWPPP, INCLUDE PERIMETER CONTROLS AND STABILIZED CONSTRUCTION ENTRANCE. 2. CALL FOR RE-INSPECTION ASAP (419-2466) |