Permit: T03BU02451

Parcel: 122153120

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
03/11/2005 STORMWATER FOLLOW-UP INSP Approved
01/06/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. SWEEP SEDIMENT FROM PUBLIC RIGHT OF WAY.
2. SUBGRADE IS BEING PREPARED. CONTRACTOR WILL SWEEP STREETS TO CONTROL TRACKING IN LIEW OF GRAVEL ENTRANCE. CURRENTLY ENTRANCES ARE AB HARDPACKED.
11/30/2004 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTIONS HAVE BEEN MADE.
11/24/2004 STORMWATER FOLLOW-UP INSP Correction Required PARTIAL CORRECTION HAS BEEN MADE, SILT FENCING HAS BEEN INSTALLED ON THE DOWN GRADIENT PORTION OF THE SITE.
1. PROVIDE GRAVEL AT STABILIZED CONSTRUCTION ENTRANCES.
11/17/2004 STORMWATER FOLLOW-UP INSP Correction Required CONCORD CONSTRUCTION-TOM EINWECK 419-3907
1. PROVIDE THE SWPPP CONTROLS PER SWPPP, INCLUDE PERIMETER CONTROLS AND STABILIZED CONSTRUCTION ENTRANCE.
2. CALL FOR RE-INSPECTION ASAP (419-2466)