Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU02178
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2006 | STORMWATER FOLLOW-UP INSP | Approved | PROJECT WAS RE-SEEDED OVER 2 YEARS AGO. SITE IS STABLE AND NO CONSTRUCTION IS OCCURRING. |
|
| 07/12/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 06/06/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | POST THE AZPDES AUTHORIZATION AT THE ENTRANCE | |
| 03/07/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONSTRUCTION AT THIS TIME. THE M&I BANK BUILDING ON THE SOUTHEAST CORNER OF THE DEVELOPMENT IS COMPLETE AND THE ONLY BUILDING AT THIS SITE. THE UN-BUILT LOTS HAVE BEEN HYDRO-SEEDED AND THE SPRING FLOWERS ARE IN FULL BLOOM. NO STORMWATER CONCERNS AT THIS TIME. |
|
| 07/02/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | I spoke with the superintendent on site and advised him that he needs to stablize the extra entrance which is being used. He said he would move the extra gravel he had on site to the entrance on Monday. No other storm water concerns at this time. | |
| 06/02/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | This site remains in good condition and is in compliance with the storm water pollution prevention plan. | |
| 05/04/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | This site is in good condition with storm water controls in place and being maintained. Site has had some dirt piled next to the roadway however is being held for back fill to complete a TEP digging project. |