Inspection History Details
Permit: T03BU02138
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2004 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 11/10/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS. | |
| 10/20/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | NO STORMWATER CONCERNS. SITE IS NEARLY COMPLETE. ESTIMATED COMPLETION IS 2-3 WEEKS. |
|
| 09/22/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SEDIMENT ACCUMALATED AT NEW PARKING LOT ENTRANCES THAT CAN SERVE AS SEDIMENT TRAPS UNTIL THE ASPHALT IS INSTALLED. 2. SWEEP PUBLIC PARK STREETS OF ALL SEDIMENT. 3. REPAIR SILT FENCE WHERE SEDIMENT ESCAPED DURING THE SEPT. 18-19 RAIN EVENT. 4. PROVIDE SEDIMENT AND EROSION CONTROLS AT NORTH/NORTHWEST PERIMETER. |
|
| 09/14/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | I MET WITH JACK (609-0798) OF ANDERSON CONST. CO. 1. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE AT NORTH SIDE OF PROJECT. 2. PROVIDE MORE GRAVEL OR BARRICADE THE SOUTH CONSTRUCTION ENTRANCE SO VEHICLE TRAFFIC WILL BE GUIDED OVER THE GRAVEL. 3. SWEEP THE PUBLIC PARK ROADWAYS OF ALL ACCUMALATED SEDIMENT TRACKED FROM THIS PROJECT. 4. REPAIR OR REPLACE BROKEN STAKES ON SILT FENCE AND OVERLAP SPLICES AT LEAST 6". 5. WATER DOWN SITE TO CONTROL DUST. |