Permit: T03BU02009

Parcel: 138180620


Addresses:

6748 S 6TH AV

Inspection Status: Correction Required

Inspection History: GRADING - FINAL

Date Description Inspector Results Comments
01/12/2009 GRADING - FINAL Correction Required Site un-changed. No activity.
09/17/2007 GRADING - FINAL Correction Required No activity on site.
08/02/2007 GRADING - FINAL Correction Required No activity on site.
06/26/2007 GRADING - FINAL Correction Required No activity on site. Spoke to Kent project engineer, Kent said he was not aware work had not beed completed. Kent said he would contact the contractor to see whats going on.
06/05/2007 GRADING - FINAL Correction Required No activity on site since meeting with Kent Delph 4/26/07.
04/26/2007 GRADING - FINAL Correction Required Met on site with Kent Delph, Permit Applicant, Ron Calderon, Owner. I explained to both we had received a complaint from a homeowner in regards to the un-finished work in the drainage way. Kent will need to:
1- Provide an as-built plan to the city for review with all on site changes.
2- Provide the city with some type of time schedule for work.
3- The grading permit will need to be un-expired.
4- Contractor needs to complete all rip rap work and paving.
04/26/2007 GRADING - FINAL Correction Required THIS SITE WAS CHECKED AFTER A RECENT COMPLAINT, THE FOLLOWING ITEMS HAVE BEEN NOTED NOT TO BE PER THE APPROVED PLANS. THIS LIST OF INCOMPLETE ITEMS IS NOT TO BE CONSIDERED THE FINAL PUNCHLIST FOR THE SITE, THIS IS ONLY A LIST OF ITEMS THAT NEED TO BE REVIEWED BY BOTH THE ENGINEERING AND ZONING DEPARTMENTS:
1) THE ROCK RIPRAP THAT IS SPECIFIED ON THE APPROVED PLANS HAS NOT BEEN INSTALLED. THE ENGINEER OF RECORD WILL NEED TO PROVIDE US EITHER VERIFICATION OF MATERIAL IN PLACE, OR A REVISED DRAWING APPROVED BY ALL CONCERNED PARTIES NOTING THE CHANGES.
2) THE DRIVEWAY ACCESS POINTS FOR LOTS #2 - #4 HAVE NOT BEEN CONSTRUCTED AS SHOWN ON THE APPROVED PLANS. LOT #2 IS EITHER GAINING ACCESS TO HIS PROPERTY THROUGH LOT #1 OR FROM THE ALLEY LOCATED ON THE WEST SIDE OF THE PROPERTY. LOTS #3 AND #4 WERE TO SHARE A SINGLE DRIVEWAY BUT HAVE CONSTRUCTED DRIVEWAY ACCESS POINTS ON EACH LOT. THE CHANGES THAT HAVE BEEN MADE WILL REQUIRE A REVISED DRAWING SIGNED BY THE ENGINEERING AND ZONING DEPARTMENTS.
06/02/2005 GRADING - FINAL Denied NO WORK BEING COMPLETED ON THIS SITE AT THIS TIME. FILL MATERIAL HAS BEEN ADDED TO THE SITE BUT NO STORM CONTROLS ARE PRESENT AT THIS TIME.