Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T03BU01928
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2006 | GRADING - INTERMEDIATE | Approved | ||
| 07/28/2006 | GRADING - INTERMEDIATE | Not ready for Inspection | CHECKED DRAINAGE CHANNEL ALONG COURTYARD (RAINING AT TIME OF INSPECTION) DRAINAGE CHANNEL APPEARED TO DRAIN, NO PONDING WATER VISIBLE, HOWEVER WATER DOES POND AT ENTRANCE TO COURTYARD. |
|
| 02/21/2006 | GRADING - INTERMEDIATE | Not ready for Inspection | MET WITH CONTRACTOR, IDENTIFIED WHAT WOULD BE REQUIRED IN ORDER TO GET A C OF O FOR ALL BLDGS AND FINALIZE THE GRADING PERMIT. CONTRACTOR MUST COMPLETE SITE WORK IN ACCORDANCE WITH THE APPROVED GRADING PLAN PRIOR TO C OF O APPROVAL AND GRADING PERMIT FINAL INSPECTION APPROVAL. | |
| 10/05/2005 | GRADING - INTERMEDIATE | Not ready for Inspection | PRIOR TO THE APPROVAL FOR A TEMP C OF O FOR BLDG#3: 1) PROVIDE AN APPROVED (COT DSD ENG) REVISION FOR CHANGES MADE TO THE WALKWAY AND DRAINAGE STRUCTURES AT THE CONNECTION POINT BETWEEN BLDGS #4,5, AND 3. 2) REMOVE CONSTRUCTION DEBRIS, MATERIALS, AND EQUIPMENT FROM AROUND BLDG#3. 3) BARRICADE LANDSCAPE TRENCHING AND/OR HOLES. 4) FINISH REQUEST TO COMPLETE THE CONNECTION BETWEEN ROOF DRAINS AND SCUPPERS AT BLDGS 4 AND 5. 5) ENSURE CONSTRUCTION ACTIVITY IS SEPARATED FROM OCCUPIED BLDGS. |
|
| 09/21/2005 | GRADING - INTERMEDIATE | Revision | DISCUSSED CHANGE TO SIDE WALK AT EAST END OF BLDG #4. CONTRACTOR WILL CHANGE THE TIE-IN BETWEEN BLDGS #4, 3 AND 5. MUST ENSURE THE GRADE IS AT 1:12 OR LESS AND DRAINAGE IS ALLOWED TO FLOW UNDER SIDEWALK. ALL CHANGES TO THE PLAN MUST BE APPROVED BY ENGINEERING. | |
| 09/15/2005 | GRADING - INTERMEDIATE | Partial Approval | FOLLOW UP SITE INSPECTION ACCOMPLISHED. NO MAJOR GRADING CONCERNS AT THIS TIME. SITE WORK NOT COMPLETED. ITEMS STILL NOT COMPLETED THAT WERE LISTED ON THE PUNCH LIST GENERATED FOR BLDG #1 | |
| 08/18/2005 | GRADING - INTERMEDIATE | Partial Approval | FOLLOW UP INSPECTION: 1) MOST ROOF DRAINS ARE NOT CONNECTED TO SIDEWALK SCUPPERS 2) SITE WORK NOT COMPLETED. 3) NO FENCING ON SITE TO SEPARATE CONSTRUCTION ACTIVITY WITH PROPOSED OCCUPIED BLDGS. 4) NO GRATES/SCREENS AT INLET (STORM WATER) ON EAST WALL. 5) MOST CURBS ARE IN PLACE AT TOP OF HC RAMPS. 6) MUST PROTECT CATCH BASIN FROM SILT AT NW CORNER OF SITE WITH SEDIMENT CONTROLS UNTIL THE SITE IS 100% STABILIZED. |
|
| 08/04/2005 | GRADING - INTERMEDIATE | Partial Approval | 1) ENSURE ROOF DRAINS ARE CONNECTED TO SIDEWALKS SCUPPERS 2) COMPLETE SIDEWALKS TO INCLUDE ALL SCUPPERS PER APPROVED PLAN ( N. SIDE BLDG#5, E. SIDE BLDG#5, ALL BLDG#1). 3) ENSURE STORM WATER DOES NOT DRAIN ACROSS HC RAMPS. 4) INSTALL GATES AND/OR FENCING ON WALL INLETS LOCATED ON E. SIDE OF SITE. 5) COMPLETE PAVING AND STRIPING AT SITE. 6) INSTALL SIGNS AT ALL HC PARKING AREAS. |
|
| 07/18/2005 | GRADING - INTERMEDIATE | Not ready for Inspection | PRIOR TO OCCUPANCY OF BLDG'S, THE SITE MUST HAVE THE FOLLOWING: 1) PROVIDE AN APPROVED, REVISED SET OF PLANS FOR THE INSPECTION. 2) NO LIFE, SAFETY ITEMS OUTSTANDING 3) PUBLIC ACCESS FREE OF OBSTRUCTIONS, (CONST. DEBRIS, MATERIAL AND EQUIPMENT). 4) ADEQUATE PARKING PER APPROVED PLAN FOR ALL OCCUPANTS. 5) TRASH ENCLOSURE COMPLETED PER PLAN. 6) SEPARATE ALL CONST ACTIVITY FROM OCCUPIED BLDG'S ( TEMP FENCING, BARRICADES ECT) 7) DRAINAGE STRUCTURES COMPLETED PER PLAN, ( CATCH BASINS, SCUPPERS, UNDERDRAINS, DOWN SPOUTS ECT.) THIS LIST IS NOT PERMANENT AND CAN CHANGE PER THE INSPECTOR ON SITE AS ADDITIONAL INSPECTIONS ARE ACCOMPLISHED. |