Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FINAL INSPECTION
Permit Number - T03BU01928
Inspection Description - STORMWATER FINAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2006 | STORMWATER FINAL INSPECTION | Approved | ||
| 06/25/2004 | STORMWATER FINAL INSPECTION | Partial Approval | I met with the superintendent (Robert Quesada) with Fina Companies on this date. I advised Robert to build a designated concrete wash out area once they have concrete trucks come in. The site is in good condition with all the appropriate storm water controls installed. The site is in the process of excavating all the old concrete left over from an older project. No other storm water concerns at this time. Site will be reschdeduled for July, 13th. |