Permit: T03BU01819

Parcel: 133153050

Inspection Status: Correction Required

Inspection History: GRADING - FINAL

Date Description Inspector Results Comments
09/29/2009 GRADING - FINAL Correction Required LOOKED OVER THE SITE, CONSTRUCTION IS IN THE PROCESS ON THE TWO NEWEST BUILDINGS. THIS SITE IS NOT READY BUT HAS NOT CHANGED IN A MANNER THAT SHOULD AFFECT THE CURRENT TEMPORARY C OF O. THE GRADING FOR THIS SITE WILL BE CHECKED ONCE ALL OF THE EXTERIOR WORK HAS BEEN COMPLETED IN THE NEW CONSTRUCTION AREAS. I WILL ADVISE THE PROPERTY OWNER THAT ALL AREAS THAT ARE UNDER CONSTRUCTION ADJACENT TO PEDESTRIAN ACCESS AREAS WILL NEED TO BE PROTECTED TO PREVENT PUBLIC ACCESS. BUILDING PERMIT #T03CM03908 HASBEEN APPROVED FOR THE FINAL C OF O EVEN THOUGH ALL OF THE SITE IS NOT COMPLETE AND THERE ARE STILL MINOR OUTSTANDING AREAS TO BE COMPLETED. I WILL BE CHECKING THE SITE DURING OCTOBER TO SEE WHAT WORK IS STILL NEEDED AND WHAT NEEDS TO BE REFLECTED ON AS-BUILT DRAWINGS FOR THIS SITE. IT APPEARS AT THIS TIME THAT ALL OF THE PLANS MAY NEED TO BE CHANGED TO REFLECT THE CHANGES THAT HAVE BEEN MADE SO FAR. I WILL BE ASKING DAVID RIVERA TO LOOK AT MY COMMENTS AND DETERMINE IF THE SITE/DEVELOPMENT PLANS NEEDS TO BE CHANGED AS WELL AS THE CURRENT GRADING PLAN.
10/21/2005 GRADING - FINAL Denied 1. SUBMIT A PHASED GRADING AND SITE PLANS FOR REVIEW AND APPROVAL BY THE CITY OF TUCSON ENGINEERING AND ZONING DIVISIONS.
2. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE PROJECT AND RETENTION/DETENTION BASINS HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS.
3. PROVIDE THE CORRECT FINISHED FLOOR ELEVATION FOR BLDG. "A".
4. RE-CONSTRUCT THE STEEP ACCESS RAMP ON THE SOUTHEAST CORNER OF BLDG. "A", AND PROVIDE BARRICADE RAILING AT THE TOP OF THE RETAINING WALL.
5. CONSTRUCT THE SOLID WASTE TRASH ENCLOSURE AT SOUTHEAST CORNER OF SITE.
6. PROVIDE 5' AND 6' MASONARY SCREEN WALLS AND 42" BARRICADE RAILING ON THE SOUTH PERIMETER OF THE SITE.
7. CONSTRUCT THE SIDEWALK AND CURB ON THE NORTH SIDE OF THE BUILDING AS SHOWN ON THE PLAN. PROVIDE 2.5' OF VEHICLE OVERHANG AND 4' OF CLEAR PEDESTRIAN ACCESS ON SIDEWALK.
8. PROVIDE 6" CURBING ON THE INTERIOR PERIMETER OF THE SITE. THE 3.5" CURBS THAT HAVE BEEN CONSTRUCTED ARE NOT PER PLAN SPECIFICATIONS. ADDRESS THE ELEVATION DROP AT THE NORTHEAST CORNER OF BLDG. "C".
9. CONSTRUCT RETENTION/DETENTION BASINS AND THE SWALE ACROSS THE DRIVEWAY AS SHOWN ON THE PLAN.
10. PROVIDE (7) 4' INLETS TO BASIN #1, (6) 2' INLETS TO BASIN #2, AND THE INLET SIDEWALK SCUPPER TO BASIN #3.
11. PROVIDE CURBING AND COMPLETE ASPHALT PAVING ON THE NORTH PERIMETER OF THE SITE.
12. REMOVE TREES AND CURBING LOCATED IN THE PARKING AREA ACCESS LANE (PAAL) AND THE PARKING SPACES. (4) TREES LOCATED IN THE PAAL; (13) TREES LOCATED IN PARKING SPACES; THE TREES AT THE SOUTHWEST CORNER OF BLDG. "A" THAT BLOCK THE SIGHT VISIIBILITY TRIANGLE; TREES THAT CONFLICT WITH 2.5' VEHICLE PARKING OVERHANG.
13. PROVIDE DRAINAGE UNDER SIDEWALKS FOR THE ROOF DRAINAGE ON THE EAST AND SOUTH SIDES OF BLDG. "A" AND AT THE SOUTH END OF RETENTION/DETENTION BASIN #3.
14. PROVIDE SLOPE STABILIZATION AT NORTH PERIMETER OF BLDG. "A", AT TEP TRANSFORMER PAD, AND ON THE BANKS OF THE RETENTION/DETENTION BASINS. NOTE: 1:1 SLOPES REQUIRE GROUTED ROCK RIPRAP, 2:1 SLOPES REQUIRE HAND PLACED ROCK RIPRAP ON FILTER FABRIC.
15. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
10/14/2005 GRADING - FINAL Denied COURTESY INSPECTION, SITE IS NOT READY FOR INSPECTION.
1. ADDRESS SOLID WASTE ENCLOSURE FOR PHASE I.
2. COMPLETE ALL SITE WORK.
3. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS.
4. SUBMIT A PHASED SITE AND GRADING PLANS FOR REVIEW AND APPROVAL BY C.O.T. ENGINEERING AND ZONING DIVISIONS.
04/07/2005 GRADING - FINAL Not ready for Inspection FINAL GRADING IS NOT READY FOR INSPECTION AT THIS TIME. CLIENT WAS A LITTLE CONFUSED ON WHAT THE FINAL GRADING INSPECTION INVOLVED.