Inspection History Details
Inspection Status: Denied
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2008 | GRADING - FINAL | Denied | NOT READY NOTE: FINAL GRADING INSPECTION CAN BE COMPLETED AND APPROVED WHEN BUILDING PADS ARE STABILIZED AND ALL SITE IMPROVEMENTS ARE COMPLETED. 1. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFIES ALL SITE WORK AND DRAINAGE. 2. THE REVISED/AS-BUILT GRADING PLAN MUST BE SUBMITTED TO THE C.O.T ENGINEERING DIVISION. ONCE THIS PLAN IS APPROVED THE ENGINEER MAY SUBMIT THE CERTIFICATION LETTER (SEE COMMENT #1 ABOVE.) 3. ADDRESS TRUNCATED DOMES FOR PEDESTRIAN ACCESSWAYS. A.D.A. REQUIRES TRUNCATED DOMES WHERE PEDESTRIAN ACCESSWAYS INTERSECT WITH VEHICULAR AREAS. 4. STABILIZE SITE AND PROVIDE STABILIZATION CERTIFICATION. 5. CONSTRUCT TRASH ENCLOSURES WITH 10' CLEARANCE ON ALL SIDES WITHIN BOLLARDS AND GATES. 6. PROVIDE ALL BICYCLE PARKING 7. CONSTRUCT ALL SIDEWALKS ON PUBLIC R.O.W. |