Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CHECKED CONDITION OF SOIL STABILIZATION | |
| 02/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CHECKED THE STATUS OF THE SOIL STABILIZATION, DAVID REILY WILL SEND STABILIZATION CERTIFICATION. | |
| 02/11/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | RECEIVED COPIES OF THE WINDSWEPT ORGANIX WARRANTY STATEMENT. | |
| 01/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SOIL STABILIZATION IS SCHEDULED FOR FOR TOMORROW FOR ALL UN-BUILT LOTS DAVID REILLY 400-1052 |
|
| 10/29/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 07/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | GRADE BOTTOM OF R/D BASIN TO 79.3 - 79.0 ELEVATIONS AND PROVIDE POSITIVE SLOPE TO LOW FLOW PIPE AND VERIFY 12 HOUR PERCOLATION RATE. | |
| 07/20/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS REQUIRED BY MONDAY 7-30-07 1. REMOVE STRAW WATTLE THAT IS DAMAGED OR NO LONGER NEEDED. 2. STABILIZE NORTH PERIMETER OF SITE AT TOE OF SLOPE AND NATURAL WASH. 3. GRADE BOTTOM OF R/D BASIN TO 79.3 - 79.0 ELEVATIONS AND PROVIDE POSITIVE SLOPE TO LOW FLOW PIPE. 4. VERIFY 12 HOUR PERCOLATION IN BASIN. 5. PROVIDE POSITIVE DRAINAGE AND SWPPP CONTROLS FOR WEST PERIMETER. |
|
| 02/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 02/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 01/29/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | R/D BASIN IS ROUGH CUT NO STORMWATER CONCERNS |
|
| 08/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS I PICKED UP MY COPIES OF THE SWPPP, GP AND DP FROM THE WATERPROOF ENCLOSURE ON SITE. |
|
| 08/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWPPP CONTROLS HAVE BEEN MAINTAINED | |
| 08/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | I MET BRYCE ON SITE TO OBSERVE CORRECTIVE ACTIONS | |
| 08/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | THE RETENTION/DETENTION BASIN AND SLOPE STABILIZATION AT THE NORTH PERIMETER OF THIS SITE HAS NOT BEEN CONSTRUCTED. CONSTRUCTION ACTIVITY HAS NOT OCCURRED WITHIN 14 DAYS. STORM WATER EROSION AND SEDIMET CONTROLS ON THE NORTH PERIMETER HAVE BEEN COMPROMISED DUE TO THE LACK OF R/D BASIN AND STABILIZATION OF THE FILL SLOPES. 1. CONSTRUCT THE RETENTION/DETENTION BASIN. 2. STABILIZE FILL SLOPES AT NORTH PERIMETER. 3. RE-SET FILTER SOCK. 4. REMOVE SEDIMENT FROM FACE OF FILTER SOCK AND IN THE WASH. 5. PROVIDE A COPY OF THE SWPPP ON SITE IN A WATERPROOF ENCLOSURE. THE EXISTING SWPPP IN THE TUBE IS WET NAND NOT ACCESSABLE. I HAD PHONE CONVERSATIONS WITH WESTLAND RESOURCES KRISTA DEWALT 909-6419 BRYCE 909-2148 |
|
| 02/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE CORRECTIONS LISTED FOR 2-10-06 INSPECTION. NO ACTIVITY AT THIS SITE. |