Permit: T03BU01371

Parcel: 13332027B


Addresses:

9201 E BROADWAY BL

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
03/30/2006 STORMWATER INSTALL OF CONTROLS Approved PROVIDE RETAINING WALLS/SLOPE PROTECTION RIPRAP ON NORTH PERIMETER, ASAP, SINCE STORMWATER RUN-OFF COULD ERODE THIS END OF PROPERTY.

WESTLAND RESOURCES: KRISTA DEWALT 206-9585/BRYCE MONTENEGRO 909-2148 WILL HANDLE THE SWPPP SERVICES FOR THIS SITE.
02/10/2006 STORMWATER INSTALL OF CONTROLS Correction Required 1. POST AZPDES AUTHORIZATION AND PROVIDE AND ON-SITE COPY OF THE SWPPP.
2. RE-LOCATE ROCK ON TO STABILIZED CONSTRUCTION ENTRANCE.
3. VERIFY THAT EACH STRAW BALE HAS (2) STAKES EACH.
4. PROVIDE POSTITIVE DRAINAGE CHANNEL AT THE WEST PERIMETER.
5. PULL BACK SOIL FROM OUTSIDE PERIMETER TO PROJECT SIDE OF SWPPP CONTROLS.
6. LOCATE THE CONCRETE WASH OUT AWAY FROM THE STORMWATER DRAINAGE IN A LOCATION WHERE A CONCRETE SLAB OR ASPHALT PAVEMENT WILL BE CONSTRUCTED.
02/07/2006 STORMWATER INSTALL OF CONTROLS Not ready for Inspection INSPECTION RESCEDULED BY CONTRACTOR.
01/31/2006 STORMWATER INSTALL OF CONTROLS Correction Required 1. POST AZPDES AUTHORIZATION AND PROVIDE AND ON-SITE COPY OF THE SWPPP.
2. RE-LOCATE ROCK ON TO STABILIZED CONSTRUCTION ENTRANCE.
3. INSTALL STRAWBALES ALL THE WAY TO THE NW CORNER OF THE SITE AND VERIFY THAT EACH STRAW BALE HAS (2) STAKES EACH.
4. PROVIDE POSTITIVE DRAINAGE CHANNEL AT THE WEST PERIMETER.
5. PROVIDE SILT FENCE ON WEST PERIMETER AT THE SOUTHWEST SIDE OF THE SITE.
6. PULL BACK SOIL FROM OUTSIDE PERIMETER TO PROJECT SIDE OF SWPPP CONTROLS.
01/20/2006 STORMWATER INSTALL OF CONTROLS Denied MET WITH LUIS VASQUEZ (471-2344) EAGLE ROCK.
AZ CON-15733 EFFECTIVE DATE 8-16-05
1. CALL FOR STORMWATER PRE-CONSTRUCTION MEETING FOR TUESDAY. DEVELOPER AND EAGLE ROCK GENERAL SUPERINTENDENT TERRY SPURR (891-3056) ARE REQUESTED TO ATTEND.
2. COMPLETE ALL STORMWATER CONTROL INSTALLATION BEFORE ADDITIONAL EARTH WORK OCCURS.
3. POST THE AZPDES AUTHORIZTION.