Permit: T03BU01293

Parcel: 14118520C


Addresses:

9338 E OLD VAIL RD

Inspection Status: Continued

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
04/08/2008 STORMWATER FOLLOW-UP INSP Continued NO CHANGE IN SITE
06/12/2006 STORMWATER FOLLOW-UP INSP Correction Required NO WORK BEING DONE ON SITE
MORE STOCKPILING
04/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE OTHER THAN MORE EQUIPMENT AND STOCKPILING GOING ON
01/05/2006 STORMWATER FOLLOW-UP INSP Correction Required SOME TRACKING ONTO OLD VAIL RD
=PROVIDE A STABILIZED CONSTRUCTION ENTRANCE AND SWEEP OLD VAIL RD
10/26/2005 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE TO TOM GREER WITH GRG 544-8933. THIS WORK IS SPORADIC DUE TO BUSY CONSTRUCTION SCHEDULES FOR OTHERS. TOM WILL CALL IN REGULAR INSPECTIONS AND AS WORK PROGRESSES TO KEEP THE GRADING PERMIT OPEN. F/U INSPECTION SCHD FOR 01/05/2006
02/17/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME.
02/14/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME.
01/06/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS.
A CHEMICAL STORAGE AREA WITH SECONDARY SPILL CONTAINMENT HAS BEEN PROVIDED.
12/20/2004 STORMWATER FOLLOW-UP INSP Correction Required NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ON 12-13-04
12/13/2004 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS COMPLETE FOR ITEMS 1 & 3 OF PREVIOUS INSPECTION.
1. PROVIDE PROPER STORAGE FOR ALL 55 GALLON DRUMS AND CONTAINERS OF CHEMICAL AND PETROLEUM PRODUCTS.
12/06/2004 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION REQUIRED.
1. PROVIDE SEDIMENT AND EROSION CONTROL AT THE LOW SPOT ON THE SOUTH PERIMETER OF EQUIPMENT YARD.
2. PROVIDE APPROVED STORAGE LOCATION FOR ALL CHEMICAL AND PETROLEUM PRODUCTS THAT ARE STORED ON SITE. PROVIDE PROTECTION FROM RAINFALL AND SECONDARY SPILL CONTAINMENT.
3. CLEAN UP SPILLED CHEMICAL UNDER AND AROUND THE PORTABLE TOILET LOCATED AT THE SOUTHEAST CORNER OF THE EQUIPMENT YARD.