Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2004 | STORMWATER INSTALL OF CONTROLS | Approved | CANCELED, INSPECTION APPROVED 11-04-04 | |
| 11/04/2004 | STORMWATER INSTALL OF CONTROLS | Approved | CORRECTIONS HAVE BEEN COMPLETED. | |
| 10/29/2004 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1. POST AZPDES AUTHORIZATION AT ENTRANCE. 2. STAKE THE EAST PERIMETER STRAW WATTLE TO PREVENT WATTLE FROM FLOATING ON TOP OF STORMWATER RUN-OFF. |
|
| 10/27/2004 | STORMWATER INSTALL OF CONTROLS | Cancelled | RESCHEDULED FOR 10-29-04 | |
| 10/21/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | NO CHANGES HAVE BEEN IMPLICATED AT THIS TIME PER THE LAST INSPECTION ON 10/13/04. RE-SCHEDULED FOR WED. THE 27TH. | |
| 10/13/2004 | STORMWATER INSTALL OF CONTROLS | Correction Required | NOTE: V-DITCH AND EARTHEN BERM IS BEING USED IN PLACE OF THE SILT FENCE. 1. POST AZPDES AUTHORIZATION AT SITE ENTRANCE. 2. PROVIDE DUST CONTROL, WATER DOWN SITE AND MAINTAIN CRUST. 3. RE-ESTABLISH PERIMETER V-DITCH AND COMPACT EARTHEN BERM WITH WATER. |
|
| 10/06/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | 1. POST AZPDES AUTHORIZATION AT ENTRANCE. |