Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2005 | GRADING - FINAL | Approved | Fina Grading Inspection Approved. | |
| 07/06/2005 | GRADING - FINAL | Denied | DENIED 1) REMOVE STRAW BALES, REBAR AND SNOW FENCING LOCATED ON THE N. SIDE OF THE BOOSTER STATION OFF OF STARR PASS BL. 2) REMOVE ALL LOOSE ROCK AND SEDIMENT FROM TOP OF CURB ADN ROADWAY LOCATED ALONG THE NE CORNER OF THE MARRIOTT. 3) REMOVE ALL LOOSE ROCK AND SEDIMENT FROM NORTHERN DRAINAGE CHANNEL. 4) PROVIDE HEADER CURB FOR THE HANDICAP RAMP ACCESS LOCATED ALONG STARR PASS BL. AT THE NE CORNER OF THE MARIOTT. 5) INSTALL ADDITIONAL ROCK-RIP-RAP AT THE INLET OF THE NORHTHERN DRAINAGE CHANNEL MENTIONED ABOVE COMMENT #4. 6) PROVIDE EROSION PROTECTION FOR ROOF DRAIN AT THE NE CORNER OF THE MAIN BUILDING. 7) REMOVE SEDIMENT FROM CATCH BASIN WITHIN LANDSCAPE AREA TO THE WEST OF THE MAIN ENTRANCE LOBBY. ALSO REMOVE ROCK AND LOOSE SEDIMENT AT THE INLET PIPE TOWARDS THE NE OF THE MAIN ENTRANCE LOBBY. 8) REMOVE ALL STRAWBALES AND SAND BAGS LOCTED AT TWO SEPERATE CULVERTS ALONG THE TOHONO RIDGE ROAD TO THE SOUTH WEST. |