Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T03BU01259
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/20/2004 | GRADING - FINAL | Approved | ||
02/25/2004 | GRADING - FINAL | Denied | 1. SUBMIT A REVISED GRADING PLAN TO THE CITY OF TUCSON ENGINEERING DIVISION FOR APPROVAL. SHOW ALL AS-BUILT MODIFICATIONS. 2. PROVIDE A STAMPED AND APPROVED GRADING PLAN FOR FOLLOW-UP INSPECTION. 3. MAKE CORRECTIONS TO NORTH DRAINAGE SWALE. 4. BUILD UP RETENTION BASIN BANK ,25' HIGHER THAN WEIR SURFACE OR REBUILD WEIR AT CORRECT ELEVATION. 5. CALL DAVE ROBERTS (349-5845) FOR ON-SITE MEETING PRIOR TO FINAL GRADING CONSTRUCTION OF THE RETENTION/DETENTION BASIN AND NORTH DRAINAGE SWALE. |
|
02/18/2004 | GRADING - FINAL | Denied | 1. BUILD UP TOP OF RETENTION BASIN BERM TO ELEVATION 67.1 ELEVATION. 2. PROVIDE FILTER FABRIC UNDER ROCK RIP RAP AT INLETS AND OUTLETS OF RETENTION/DETENTION BASIN. 3. PROVIDE A COPY OF THE REVISED AND APPROVED DEVELOPMENT PLAN. |
|
11/19/2003 | GRADING - FINAL | Denied | SITE IS NOT READY FOR INSPECTION. |