Inspection History Details
Permit: T03BU00897
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/20/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGES SITE NEEDS FINALED | |
| 06/07/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | STILL NEED TO ADDRESS DRAINAGE BETWEEN THE CENTER ROW OF HOUSES. HOUSES ON WEST SIDE ARE GOING TO FLOOD. JIM BRODIE | |
| 03/28/2007 | STORMWATER FOLLOW-UP INSP | Approved | THE MAJORITY OF THE SITE IS STABILIZED. STORM WATER CONTROLS SHOULD ONLY BE PLACED AT CATCH BASINS NEAR LOTS THAT HAVE NOT BEEN BUILT ON. | |
| 03/06/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES SINCE LAST INSPECTION. | |
| 01/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES | |
| 12/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGES SINCE THE LAST INSPECTION | |
| 11/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES SINCE LAST INSPECTION | |
| 10/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PRIOR TO FINAL GRADING APPROVAL, ADDRESS THE DRAINAGE BETWEEN THE FIRST AND SECOND ROW OF HOUSES. PROVIDE AN APPROVED GRADING PLAN SHOWING ANY CHANGES MADE ON SITE. NO STORM WATER CONCERNS AT THIS TIME. |
|
| 07/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORMWATER CONCERNS | |
| 04/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | HABITAT FOR HUMANITY SITE, NO STORM WATER CONCERNS AT THIS TIME. | |
| 03/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS AT THIS TIME | |
| 03/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME | |
| 12/21/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) ENSURE CONSTRUCTION ACTIVITIES ARE SEPARATED FROM OCCUPIED STRUCTURES (BARRICADES, FENCING ECT.). 2) SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED. 3) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE RET/DET BASIN WAS BUILT IN ACCORDANCE WITH THE APPROVED PLANS. 5) SWEEP UP ROADWAYS AS NEEDED. |
|
| 10/21/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SEE COMMENTS FROM INSPECTION DATED 8/31/05. NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME. |
|
| 08/31/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) ENSURE SEDIMENT CONTROLS CURRENTLY IN PLACE AROUND STORM WATER CATCH BASINS LOCATED ON THE SW CORNER OF THE SITE ARE ADEQUATE TO PREVENT SEDIMENT ON ROADWAYS FROM LEAVING THE SITE AND SILTING IN THE EXISTING STORM SEWER. 2) ENSURE ANY WASH WATERS FROM CONCRETE, PAINTS, AND OTHER MATERIALS ARE CONTROLLED AND KEPT ON SITE, PRIOR TO CLEAN UP. 3) ENSURE PERIODIC STORM WATER MAINTENANCE INSPECTIONS ARE ACCOMPLISHED AND DOCUMENTED PER SWPPP. 4) SWEEP UP SOIL FROM ROADWAYS. |
|
| 05/03/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) ENSURE AN APPROVED COPY OF YOUR GRADING PLAN (SHOWING AMENDMENTS AND/OR CHANGES) IS KEPT ON SITE. 2) ENSURE CONCRETE WASH OUT MATERIAL IS CONTAINED ON SITE, AND DISPOSED OF PROPERLY. 3) CONTINUE TO SWEEP STREETS AND ROADWAYS AS NEEDED. NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME. |
|
| 03/23/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SEE COMMENTS FROM FOLLOW UP INSPECTION DONE ON 3/2/05. NO ADDITIONAL STORM WATER CONCERNS AT THIS TIME. | |
| 03/02/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | ENSURE A COPY OF YOUR APPROVED SWPPP IS KEPT ON SITE. ENSURE A COPY OF YOUR NOI IS ON SITE. MINIMIZE TRACKING OF SOIL ON STREETS, SWEEP AS NEEDED. CONDUCT STORM WATER INSPECTIONS AS STATED IN SWPPP AND DOCUMENT THEM. ENSURE ANY CHANGES AND/OR AMENDMENTS TO THE GRADING PLAN ARE APPROVED PRIOR TO FINAL GRADING INSPECTION. NO OTHER STORM WATER CONCERNS AT THIS TIME. |
|
| 01/10/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE A BERM ON THE WEST SIDE OF LOTS 13-16 TO CONTAIN STORMWATER. 2. ESTABLISH THE DRAINAGE SWALE IN COMMON AREA C TO PROVIDE POSITIVE DRAINAGE, AND PROVIDE SANDBAGS AT THE SIDEWALK SCUPPERS. 3. PROVIDE SANDBAGS AT LOT 27 ON BOTH SIDES OF THE STREET. 4. REMOVE SEDIMENT AND SOIL FROM THE PUBLIC STREET. JIM BRODIE 440-7732 |
|
| 10/22/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE NOTES FROM PREVIOUS INSPECTION. | |
| 10/15/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE SEDIMENT AND EROSION CONTROLS ON THE NORTH AND WEST PERIMETERS. 2. PLACE SANDBAGS AT THE CATCH BASINS ON BOTH SIDES OF THE STREET ACROSS THE INVERT OF THE STREET ON THE SOUTHWEST SIDE OF THE PROJECT. |
|
| 10/07/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE STORMWATER EROSION AND SEDIMENT CONTROL ON THE NORTH PERIMETER. SUPERINTENDENT MATT BRODIE 440-7708 |
|
| 09/30/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. STORMWATER AND EROSION CONTROLS ON THE NORTH AND WEST PERIMETERS ARE NO LONGER IN PLACE. THESE PERIMETERS MUST BE STABILIZED BEFORE CONTROLS CAN BE REMOVED. 2. REPLACE DAMAGED GRAVEL BAGS AT SCUPPERS ON WEST SIDE OF PROJECT. 3. SWEEP STREETS ON NORTH AND WEST PERIMETERS. 4. POST AZPDES AUTHORIZATION. |
|
| 07/27/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS. | |
| 06/29/2004 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 06/07/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | PROJECT NOTES: THE ROUGH GRADING IS COMPLETE. DRAINAGE IMPROVEMENTS: CATCH BASINS, R/D BASIN AND DRAINAGE CHANNEL ARE UNDER CONSTRUCTION. 1. THE STABILIZED CONSTRUCTION ENTRANCE NEEDS MAINTENANCE. 2. PROVIDE STRAW BALE INLET CONTROL AT THE EXISTING STORM DRAIN INLET. |