Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T03BU00115
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2005 | STORMWATER FOLLOW-UP INSP | Approved | ||
09/10/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE ADDITIONAL GRAVEL AT THE STABILIZED CONSTRUCTION ENTRANCE ON THE NORTH SIDE. 2. PROVIDE ADDITIONAL MAINTENANCE ON THE STORMWATER EROSION CONTROL ON THE PERIMETER. |
|
09/02/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | I MET WITH JAMES HAMILTON 349-4377 AND SITE SUPERINTENDENT MICHEAL GENTRY 404-0777. CORRECTIONS REQUIRED. 1. MAINTAIN STABILIZE CONSTRUCTION ENTRANCE. 2. MAINTAIN SILT FENCE ON PERIMETER. 3. CLEAN-UP CONCRETE WASHOUT ON WEST SIDE OF PROJECT. |