Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2002 |
INITIAL CODE VIOLATION |
|
Correction Required |
PERMITS FOR NEW SERVICE FEEDER AND NEW PEDISTAL ARE NEEDED. AC ARTISANS IS RESPONSABLE ELECTRICAL CONTRACTOR TEP WAS CALLED AT 5:30 PM TO RE-ENERGIZE PARK. ELECTRIC WAS DISCONNECTED AT TIME OF FIRE DUE TO WORK ON ELECTRIC SERVICES. A LICENSED CONTRACTOR TO PULL PERMITS AND PERFORM WORK NEW SERVICE FEEDERS TO FROM DISCONNECT. ALSO A PERMIT FOR A NEW PEDISTAL AT #185. |