Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T02VL02333

Parcel: 116210260


Addresses:

1030 W CONGRESS ST

Inspection Status: Compliance

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
04/19/2003 FOLLOW UP CODE VIOLATION Compliance ALBERTO HAD SECURED PERMIT FOR HOT WATER TANK REPAIR ON VALVE AND EXTENDED THE FLUE PIPE HIGHER ALL PASSED INSP. ALL ISSUES HAD BEEN TAKEN CARE OF COMPLIANCE, CLOSE CASE
02/21/2003 FOLLOW UP CODE VIOLATION Correction Required 2/20/03, REVISITED SITE, TALKED WITH OWNER ALBERTO, STATED THAT HE STARTED DOING THE DRY WALL WORK AND WHEN IT RAINED FOUND ROOF LEAK, SO HE STOPED WITH DRY WALL AND IS GETTING BIDS TO REPAIR ROOF, HE HAD ASKED FOR 45 DAY EXTENSION TO GET ROOF REDONE AND FINISH REST OF ITEMS, GRANTED 45 DAY, F/U 45 DAYS
01/16/2003 FOLLOW UP CODE VIOLATION Correction Required 1/13/03, RECIVIED CALL FROM ALBERTO STATING THAT HE HAD THE HEATER REPAIRED AND THAT ONLY NEEDED TO CONNECT THERMOSTAT WIRES TOGETHER TO MAKE WORK, ON THIS REPAIR ALL MAJOR ISSUES WERE ABATED AND THAT ALBERTO AND FAMILY MOVED INTO UNIT, THERE ARE STILL SOME MINOR HOUSING ISSUES TO BE DONE, WENT OVER THEM WITH ALBERTO AND HE WILL ADDRESS AND MAKE REPAIRS. 30 DAY F/U