Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/19/2003 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
ALBERTO HAD SECURED PERMIT FOR HOT WATER TANK REPAIR ON VALVE AND EXTENDED THE FLUE PIPE HIGHER ALL PASSED INSP. ALL ISSUES HAD BEEN TAKEN CARE OF COMPLIANCE, CLOSE CASE |
| 02/21/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
2/20/03, REVISITED SITE, TALKED WITH OWNER ALBERTO, STATED THAT HE STARTED DOING THE DRY WALL WORK AND WHEN IT RAINED FOUND ROOF LEAK, SO HE STOPED WITH DRY WALL AND IS GETTING BIDS TO REPAIR ROOF, HE HAD ASKED FOR 45 DAY EXTENSION TO GET ROOF REDONE AND FINISH REST OF ITEMS, GRANTED 45 DAY, F/U 45 DAYS |
| 01/16/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
1/13/03, RECIVIED CALL FROM ALBERTO STATING THAT HE HAD THE HEATER REPAIRED AND THAT ONLY NEEDED TO CONNECT THERMOSTAT WIRES TOGETHER TO MAKE WORK, ON THIS REPAIR ALL MAJOR ISSUES WERE ABATED AND THAT ALBERTO AND FAMILY MOVED INTO UNIT, THERE ARE STILL SOME MINOR HOUSING ISSUES TO BE DONE, WENT OVER THEM WITH ALBERTO AND HE WILL ADDRESS AND MAKE REPAIRS. 30 DAY F/U |