Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T02VL02040

Parcel: 11504549A


Addresses:

931 N EUCLID AV


Inspection Status: Correction Required

Inspection History: INITIAL CODE VIOLATION

Case Number - T02VL02040

Inspection Description - INITIAL CODE VIOLATION

Inspection Status - Correction Required

Date Description Inspector Results Comments
10/22/2002 INITIAL CODE VIOLATION Correction Required 10/16/02, MET WITH GLEN (T.F.D.) AT SITE FOR ESCAPE ROUTES ALL IS OK, GLEN WILL SEND ME PAPER WORK ON VISIT,
10/22/2002 INITIAL CODE VIOLATION Correction Required 10/21/02, HAND DELIVERED AN N.O.V. FOR 5 DAYS TO RESECUE BOTH ENDS OF WALK WAYS WHERE PART IS MISSING, AND 15 DAYS TO RESECURE THE REST OF WALK WAYS THROUGH PROPERTY WHERE LOOSE AND RAILINGS ARE SEPERATING. TALKED WITH ALLEN ( MANAGER) AND HE UNDERSTANDS ABOUT RAILINGS.ALLEN HAS GONE DOWN TO D.S.D. AND SECURED PERMITS FOR REPLACEMENT OF WALKWAY WHERE MISSING, PERMIT IS ISSUED,
10/16/2002 INITIAL CODE VIOLATION Correction Required 10/14/02, VISITED SITE, TOOK PICTURES, FOUND THAT WALK WAY THAT CONNECTS BUILDING TO BUILDING AND LANDINGS, WAS PARTLY MISSING AND BLOCKED OFF BY 2X6 BOARDS, HAD ASK ALLEN (MANAGER) TO INSTALL MORE SECURITY AND CAUTION TAPE, ALLEN STATED THAT THEY WERE GOING TO MAKE REPAIRS BUT THEN STOPED DUE TO FACT THEY NEEDED TO SECURE ALL PERMITS, HE WILL BE GOING DOWN TO D.S.D. ON THURSDAY 10/17/02 TO START THE PROCESS, THEN WILL HIRE A CONTRACTOR TO DO THE REPAIRS,