Inspection Status: Approved
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2003 |
FOLLOW UP CODE VIOLATION |
|
Approved |
PERMIT ISSUED 10 APR 03. CLOSE THIS CASE. |
| 04/01/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PERMIT T02CM04575, PLANS HAVE BEEN APPROVED AND OWNER MUST PAY $186.50 BALANCE ON PERMIT. MESSAGE LEFT ON ANSWER MACHINE FOR STATUS FROM OWNER. F/U 04/24/03 |
| 01/24/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PLANS IN PLAN CHECK - WERE TOLD 4-6 WEEKS. F/U 4 WEEKS - 2/27/03 |
| 01/03/2003 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
F/U IN 14 DAYS - 01/24/03 |
| 12/13/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
1:35 PM, INSTRUCTIONS LEFT FOR MR RODRIGUEZ TO CALL INSPECTOR WITH STATUS UPDATE. F/U 01/03/03 |
| 10/23/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
30 DAY EXTENSION GIVEN AFTER SPEAKING WITH MR RODRIGUEZ WHO IS HAVING SOMEONE DRAW PLANS. F/U 12/05/02 |