Inspection History Details
Inspection Status: Partial Approval
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2004 | FOLLOW UP CODE VIOLATION | Partial Approval | WALLS COMPLETED AWAITING FINAL VISITED SITE ON FOLLOW UP INSPECTION BEFORE COURT APPEARANCE. BOTH RETAINING WALLS HAVE BEEN COMPLETED, ALL TRASH & DEBRIS HAS BEEN REMOVED FROM AREA. ATTENDED COURT. PRESENT WERE LA VIDA CONDOS PRESIDENT & HER ATTORNEY. INSP. LOPEZ INFORMED THEM THAT INSPECTION HAD BEEN DONE AT SITE & REQUESTED STATUS OF FINAL. THEY REPLIED MANAGEMENT WILL CONTACT DSD & REQUEST INSPECTION FOR FINAL. ATTORNEY ASKED IF DEFAULT COULD BE REMOVED DUE TO ASSOCIATION PRESIDENT WAS UNABLE TO ATTEND HEARING. INSP. LOPEZ INFORMED THEM PROSECUTOR PAT MERHOFF WOULD MAKE THAT DETERMINATION. CONTACTED PAT MERHOFF & APPEARED IN COURT WITH INSP. H. LOPEZ. RESPONDENT REQUESTED MORE TIME TO COME INTO COMPLAINCE. PROSECUTOR HAD NO ABJECTION. ALL PARTIES TO APPEAR MAY 7TH 2004 AT 2:00 PM FOR COMPLAINCE HEARING. |
|
| 04/12/2004 | FOLLOW UP CODE VIOLATION | Approved | 80 % COMPLETATION. VISITED SITE, COMMON AREA RETAING BLOCK WALL 80% DONE.3 CORSES & CAP BLOCK REMAIN TO BE COMPLETED. NORTHSIDE RETAINING WALL LACKING CAP FOR COMPLETATION. CONTACTED PROFESTIONAL PROPRTY MANAGEMENT, SPOKE WITH JANE, STATED INSPECTOR FROM DSD REQUIRING INSPECTION BEFORE CAP BLOCK IS SET. UNSURE OF DETAILS, GENO- MANAGER IN CHARGE OF PROJECT IS OUT OF TOWN & DUE TO RETURN WITH IN THE WEEK. JANE WILL HAVE GENO CONTACT INSP. LOPEZ FROM DNR WITH UP DATE. INFORMED JANE DNR POSTING COURT M IN. & NEED ADDRESS OF PPM TO DELIVER COURT MIN. TO LA VIDA CONDO'S JANE INFORMED INSP. THAT LA VIDA CONDO PRESIDENT HAD MOVED & DID NOT RECEVIE COURT INFORMATION. ADDRESS TO PPM. WAS GIVEN AS 3900 E TIMROD TUC. AZ. PICTURES WERE TAKEN. MADE CONTACT WITH PPM.& HAND DELIVERED COURT MIN. REQUESTED COPY BE FORWARDED TO LA VIDA CONDOS PRESIDENT, COURT MIM. WERE SIGNED BY REP. FROM PPM. |
|
| 03/10/2004 | FOLLOW UP CODE VIOLATION | Approved | SPECIAL INSP. DONE RECEVIED COPIES FROM PROPERTY MANAGEMENT OF SPECIAL INSPECTION DONE BY ENGINEER. COPIES ARE ATTACHED TO PACKET. |
|
| 03/09/2004 | FOLLOW UP CODE VIOLATION | Partial Approval | FW/UP ON PROGRESS VISITED SITE, CHECKED PROGRESS ON RETAINING WALL VIOLATION. NORTH EAST WALL HAS HAD FOOTERS POURED AND BLOCK WORK AT 80 % COMPLEATION. LACKING ONE MORE CORSE OF BLOCK, CAP BLOCK AND COMPLETE BACK FILL. COMMON AREA RETAINING WALL FOOTERS HAVE BEEN POURED AND ARE BEING ALLOWED TO CURE. AREA IS COURDINED OFF WITH CAUTION TAPE. CONTRACTOR WAITING FOR SPECHIAL ORDER BLOCK TO ARRIVE. RECENT RAINS HAS HINDERED COMPLEATION OF PROJECT ACCORDING TO CONTRACTOR (AZTEC MASONARY) PICTURES WERE TAKEN. WILL DO FOLLOW UP IN 30 DAYS. |
|
| 12/11/2003 | FOLLOW UP CODE VIOLATION | Violation | CITATION ISSUED TO LA VIDA CONDOMINUMS HOME OWNER'S ASSOC./ATTN: LINDA WOULABY | |
| 12/04/2003 | FOLLOW UP CODE VIOLATION | Violation | VISITED SITE ON FOLLOW UP INSP. (I) WALL HAS BEEN MARKED FOR REPAIRS AND (1) WALL ON NORTHWEST SIDE HAS BEEN ROPED OFF WITH CAUTION TAPE. HAD D.N.R. PERSONNEL CHECK FOR PERMITS ISSUED, PERMIT #T03BU02622 IS IN APPLIED STATUS OF PERMIT. CONTACT PROPERTY MANAGEMENT FOR STATUS ONLY. ATTEMPTED TO CONTACT PROPERTY MANAGEMENT FOR STATUS OF PERMIT. CONTACT PERSON WAS UNAVAILABLE, LEFT CELL # FOR RETURN CALL WITH RECEPTIONIST. NO CONTACT HAS BEEN MADE BY LA VIDAS CONDO REP. | |
| 09/12/2003 | FOLLOW UP CODE VIOLATION | Violation | RETAINING WALL COLLASPED. VISITED SITE, APPROX. 60 FEET OF 5 FOOT RETAINING WALL AT SOUTH WEST CORNER OF COMPLEX HAS BEEN DAMAGED BY RAINS. APPROX. 12 FOOT OF WALL HAS COLLASPED & 2 OTHER SECTIONS MEASURING APPROX. 12 FEET EACH ARE LISTING & LEANING. HAVE OPEN CASE PENDING, WILL AMEND NOTICE & REISSUE TO LA VIDA CONDOS. HOME OWNERS ASSOS. PICTURES WERE TAKEN. |
|
| 08/28/2003 | FOLLOW UP CODE VIOLATION | Correction Required | MET ON SITE FAXED COPIES OF VIOLATIONS & E-MAILED PICTURES TO NEW MANAGEMENT CO. MET WITH STRUCTURAL ENGINEER, CONTRACTOR,PROPERTY MANAGEMENT REP. & LANDSCAPE CONTRACTOR ON SITE. WENT OVER REPAIRS DONE BY ARIZ. HOME & GARDEN CONTRACTOR. ORDER PART OF N.O.V. WAS NOT FOLLOWED. ALL REPAIRS DONE WERE WITH OUT REQUIRED PERMITS. MANAGEMENT MOVING FORWARD WITH NEW CONTRACTOR & WILL KEPT ME INFORMED OF PROGRESS. PICTURES WERE TAKEN. WILL DO FOLLOW UP IN 30 DAYS. |
|
| 07/14/2003 | FOLLOW UP CODE VIOLATION | Violation | CITATION ISSUED TO VISION PROPERTY MANAGEMENT FOR UNSAFE STRUCTURE |