Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/20/2002 |
INITIAL CODE VIOLATION |
|
Correction Required |
ROOF LEAK AT REAR BEDROOM. REPAIR NEEDED AT CEILING SHEETROCK. SHEETROCK MUST BE REMOVED AND REPLACED WITH NEW. TAPED AND TEXTURED. MET WITH MAINT. SUPER (JACK) HAS SCHEDULED REPAIRS FOR 8/21/02. HAS BEEN WAITING FOR RAIN TO CHECK REPAIR AT ROOF. |