Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
Case Number - T02VL01675
Inspection Description - INITIAL CODE VIOLATION
Inspection Status - Correction Required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2002 | INITIAL CODE VIOLATION | Correction Required | ROOF LEAK AT REAR BEDROOM. REPAIR NEEDED AT CEILING SHEETROCK. SHEETROCK MUST BE REMOVED AND REPLACED WITH NEW. TAPED AND TEXTURED. MET WITH MAINT. SUPER (JACK) HAS SCHEDULED REPAIRS FOR 8/21/02. HAS BEEN WAITING FOR RAIN TO CHECK REPAIR AT ROOF. |