Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
Case Number - T02VL01584
Inspection Description - INITIAL CODE VIOLATION
Inspection Status - Correction Required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2002 | INITIAL CODE VIOLATION | Correction Required | 40'X40' SECTION OF PANELIZED ROOF COLLAPSED @ 5.55PM.TFD RESPONDED BUT FAILED TO NOTIFY DSD. BEAMS, PURLINS. SHEATHING, 2" SPRINKLER SYSTEM, ELECTRIC CIRCUITS, DUCTING ALL HEAVILY DAMAGED. OFFICE AREA FURTHER FLOODED BY BREAK IN FIRE SPRINKLER. TENANTS WOULD LIKE TCO FOR UNAFFECTED AREA OF CALL CENTER. SITE WILL NEED TO BE INSPECTED BY ELECTRICAL INSPECTOR. I WILL ALSO ASK INSPECTIONS MANAGERS STEVE LONG TO VISIT SITE IN AM. OVER LOADING OF ROOF BY RAIN WATER NORTH OFFICE AREA. BUILDING: 40' X 40' PANELIZED ROOF COLLAPSE. ELECTRIC BRANCH CIRCUITS UNDER AFFECTED AREA. PLUMBING: FIRE SPRINKLER SYSTEM IN AFFECTED AREA ROOF DRAIN IN AREA. MECHANICAL: DUCTING RUNNING THROUGH AFFECTED AREA SUMMARY PERMITS REQUIRED TO RETURN ABOVE CEILING AND ROOF AREA TO PREVIOUS CONDITION. ORIGINAL PLANS FOR PANELIZED ROOF SHOULD BE AHERED TO. FOLLOW UP 9/5/02 |