Inspection History Details
Inspection Status: Correction Required
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2003 | FOLLOW UP CODE VIOLATION | Correction Required | INSPECTOR SPOKE W/DAVID DELICH, PROPERTY MANAGER. ARCHITECT STEVE BAKER 889-5564 HAS DRWAWINGS TO SUBMIT. F/U 02/18/03 | |
| 12/19/2002 | FOLLOW UP CODE VIOLATION | Correction Required | 910 CALLED DAVID DELICH AT 747-7500 12-23-2002 RETURNING CALL FROM FRI 12-20-2 3:42 PM VOICE MAIL. ARCHITECT STEVE BOHN DRAWING PLANS FOR STRUCTURE I.E. TRUSSER SENDING SOMEONE TO VERIFY FOOTERS EXTEND UNTIL FOLLOW UP. 1/17/03 |
|
| 12/05/2002 | FOLLOW UP CODE VIOLATION | Correction Required | 3:15 PM, INSPECTOR SPOKE W/DAVE DELICH WHO CALLED TO ADVISE THAT THE ARCHITECT IS SENDING HIS ASSISTANT TO THE ADDRESS TO CHECK STRUCTURE. F/U 12/19/02 | |
| 12/02/2002 | FOLLOW UP CODE VIOLATION | Correction Required | 12:50 PM, INSPECTOR SPOKE W/DAVE DELICH WHO WILL CALL ON 12/03/02 @ 01:00 PM. | |
| 11/13/2002 | FOLLOW UP CODE VIOLATION | Correction Required | 12:15 AM, INSPECTOR SPOKE W/DAVE DELICH OVER TELEPHONE. STEVE HAHN/ARCHITECT TOLD MR DELICH THAT HE NEEDS TO CHECK THE BUILDING STRUCTURAL INTEGRITY. IF IT IS NOT PER CODE, THE BUILDING WILL HAVE TO BE TORN DOWN. | |
| 10/18/2002 | FOLLOW UP CODE VIOLATION | Correction Required | 11:10 AM PER PHONE CONVERSATION WITH DAVID DELICH, PROPERTY MANAGER, AN ARCHITECT HAS BEEN HIRED TO DO THE DRAWINGS. F/U 11/08/02 | |
| 09/30/2002 | FOLLOW UP CODE VIOLATION | Correction Required | T02CM04431 IN WALKTHRU AS OF 09/20/02. F/U 10/18/02. | |
| 09/16/2002 | FOLLOW UP CODE VIOLATION | Correction Required | DAVE THE PROPERTY MANAGER TO APPLY FOR PERMIT ON 09/17/02. F/U 09/30/02 | |
| 09/03/2002 | FOLLOW UP CODE VIOLATION | Correction Required | INSPECTOR SPOKE TO DAVE AT SAHUARO AUTO 747-7500 WHO IS WAITING ON POWER OF ATTORNEY FROM OWNER. DAVE WILL CALL TO SET UP APPOINTMENT TO MEET AT ABOVE ADDRESS. |