Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/29/2002 |
INITIAL CODE VIOLATION |
|
Correction Required |
HAVE TALK TO THE PASTOR OF THE CHURCH AND STILL WORKING ON THE DRAWINGS. HAVE APPLIED FOR PERMITS BUT NEED CORRECTION. WILL BE SUBMITTING SOON AGAIN. WILL CHECK IN 45 DAYS. |
| 04/29/2002 |
INITIAL CODE VIOLATION |
|
Correction Required |
VISITED SITE AND HAS WORK GOING ON. CALLED OFFICE AND NO PERMITS AT THIS ADDRESS HAS BEEN ISSUED. CALLED HOME # LISTED AND LEFT MESSAGE TO CALL. HAS FRONT PORCH WITH TRUSSES AND LIGHTS ADDED TO EXISTING BUILDING. HAS ADDED NEW BLOCK FACADE IN FRONT OF EXISTING BLOCK WALL. NOT BEARING WEIGHT OF ROOF SYSTEM ON NORTHSIDE OF BUILDING. MADE CONTACT WITH WIFE OF PASTOR AND WILL GIVE MESSAGE. |