Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T02VL00707
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Compliance
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/30/2002 | FOLLOW UP CODE VIOLATION | Compliance | COMBO PERMIT T02CM00138 ISSUED 9/17/02. VIOLATION ABATED. CLOSE CASE. | |
08/26/2002 | FOLLOW UP CODE VIOLATION | Correction Required | PLANS AT DSD IN PLAN CHECK HAVE BEEN EXTENDED UNTIL 1/4/03. F/U 120 DAYS. | |
06/24/2002 | FOLLOW UP CODE VIOLATION | Correction Required | NO FURTHER WORK DONE. OWNER HAS TO GO THRU HISTORICAL REVIEW. | |
05/21/2002 | FOLLOW UP CODE VIOLATION | Correction Required | NO WORK IS BEING DONE AT THIS TIME. ONLY CLEAN-UP OF DEMOLITION. OWNER IN PROCESS OF PULLING REMODEL PERMIT T02CM00138. DELAYED BECAUSE OF HISTORICAL COMMITTEE. ONLY DIFFERENCE FROM PREVIOUS INSPECTION IS ALL DEBRIS HAVE BEEN CLEANED UP OR IN PROCESS OF BEING REMOVED. | |
04/15/2002 | FOLLOW UP CODE VIOLATION | Correction Required | NOT ABLE TO ENTER DWELLING. LARGE AMOUNT OF CONSTRUCTION DEBRIS IN BACK YARD. DWELLING IS BEING TOTALLY GUTTED OUT. SOUTHWEST GAS ON SITE. TURNING OFF GAS. TOTAL RENOVATION OF INTERIOR TAKING PLACE. POSTED STEP WORK ORDER ON FRONT WINDOW. SEE PICTURES. SEND NOV. | |
04/12/2002 | FOLLOW UP CODE VIOLATION | Correction Required | TOOK PICTURES |