Inspection History Details
Inspection Status: Correction Required
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2002 | INITIAL CODE VIOLATION | Correction Required | UNIT IS OPEN IN REAR VIA DOOR AND (1) BROKEN WINDOW. THERE IS ELECT., WATER AND GAS. WILL GIVE FIVE DAYS TO SECURE. |